Team:Grenoble/Modeling/Notebook/July/29
From 2012.igem.org
July
Week 27 • Week 28 • Week 29 • Week 30Week 29: July 16th to 22th
Goal- Research of parameters for ODE's
- Integration of arabinose in our model
-
All the parameters have not been found but Arabinose has been integrated in the system. We have to work with a few arabinose else the system will always be turned on. The integration of arabinose enabled us to have a better control on cya.