Team:Calgary/Project

From 2012.igem.org

Revision as of 07:06, 2 October 2012 by Rpgguardian (Talk | contribs)

Hello! iGEM Calgary's wiki functions best with Javascript enabled, especially for mobile devices. We recommend that you enable Javascript on your device for the best wiki-viewing experience. Thanks!

Project Overview

The Calgary iGEM team chose to focus on the development on a duel system for the detection and remediation of toxic components in the tailings ponds. Tailing ponds are large lakes of toxic components produced as a result of bitumen extraction and the production of oil. Bitumen is a complex mixture of oil components that is extracted to produce oil and gas products useful for society. The raw bitumen is mixed with hydroxide and water to extract the useful hydrocarbon components. After further processing, the useful, high pH, soluble fraction is separated and further processed, while the remaining materials are released into the tailing ponds.

Figure 3.The extraction process from bitumen to oil, showing where waste like naphthenic acids is extracted