Team:Grenoble/Modeling/Notebook/June/23
From 2012.igem.org
(Difference between revisions)
Line 19: | Line 19: | ||
<b> Goal </b> | <b> Goal </b> | ||
</br> | </br> | ||
+ | <ul> | ||
+ | <li>Beginning of the study of the ODE system on the AHL-LuxR circuit</li> | ||
+ | <li>Sensitivity analysis on the AHL-LuxR circuit</li> | ||
+ | </ul> | ||
</br> | </br> | ||
<b> Completion </b> | <b> Completion </b> | ||
</br> | </br> | ||
+ | <ul> | ||
+ | We habe begun to set the differential equations and the sensitivity analysis is done. | ||
+ | </ul> | ||
</section> | </section> | ||
</div> | </div> |
Revision as of 13:04, 4 September 2012
June
Week 23 • Week 24 • Week 25 • Week 26Week 23: June 04th to 10th
Goal- Beginning of the study of the ODE system on the AHL-LuxR circuit
- Sensitivity analysis on the AHL-LuxR circuit
-
We habe begun to set the differential equations and the sensitivity analysis is done.