Team:Grenoble/Modeling/Notebook/July/29
From 2012.igem.org
(Difference between revisions)
Line 19: | Line 19: | ||
<b> Goal </b> | <b> Goal </b> | ||
</br> | </br> | ||
+ | <ul> | ||
+ | <li>Research of parameters for ODE's</li> | ||
+ | <li>Integration of arabinose in our model</li> | ||
+ | </ul> | ||
</br> | </br> | ||
<b> Completion </b> | <b> Completion </b> | ||
</br> | </br> | ||
+ | <ul> | ||
+ | All the parameters have not been found but Arabinose has been integrated in the system. We have to work with a few arabinose else the system will always be turned on. The integration of arabinose enabled us to have a better control on cya. | ||
+ | </ul> | ||
</section> | </section> | ||
</div> | </div> |
Revision as of 14:24, 4 September 2012
July
Week 27 • Week 28 • Week 29 • Week 30Week 29: July 16th to 22th
Goal- Research of parameters for ODE's
- Integration of arabinose in our model
-
All the parameters have not been found but Arabinose has been integrated in the system. We have to work with a few arabinose else the system will always be turned on. The integration of arabinose enabled us to have a better control on cya.