Team:Grenoble/Modeling/Notebook/June/26

From 2012.igem.org

(Difference between revisions)
Line 19: Line 19:
<b> Goal </b>
<b> Goal </b>
</br>
</br>
 +
<ul>
 +
<li>Beginning of the study of the Quorum sensing</li>
 +
<li>Redaction of the Grenoble part for the wiki</li>
 +
</ul>
</br>
</br>
<b> Completion </b>
<b> Completion </b>
</br>
</br>
 +
<ul>
 +
To begin the study of the Quorum sensing, we made the resolution with ODE solver, but a lot of numerical instabilities.
 +
</br>
 +
The presentation section of Grenoble is complete but needs to be checked by the advisors.
 +
</ul>
</section>
</section>
</div>
</div>

Revision as of 14:02, 4 September 2012

iGEM Grenoble 2012

Project

June

Week 23Week 24Week 25Week 26

Week 26: June 25th to July 1st


Goal
  • Beginning of the study of the Quorum sensing
  • Redaction of the Grenoble part for the wiki

Completion
    To begin the study of the Quorum sensing, we made the resolution with ODE solver, but a lot of numerical instabilities.
    The presentation section of Grenoble is complete but needs to be checked by the advisors.