Team:Grenoble/Modeling/Notebook/June/24
From 2012.igem.org
(Difference between revisions)
Line 27: | Line 27: | ||
<b> Completion </b> | <b> Completion </b> | ||
</br> | </br> | ||
- | < | + | <ul> |
The ODEs are not already set but the report is done. The stability analysis lead to the fact that the system is locally stable. We could not tell if it's globally stable or not. | The ODEs are not already set but the report is done. The stability analysis lead to the fact that the system is locally stable. We could not tell if it's globally stable or not. | ||
+ | </ul> | ||
</br> | </br> | ||
Nevertheless, after this week we stopped working on the AHL-LuxR circuit. This circuit is indeed an oscillator whereas we finally decided to design a detector. | Nevertheless, after this week we stopped working on the AHL-LuxR circuit. This circuit is indeed an oscillator whereas we finally decided to design a detector. |
Revision as of 13:23, 4 September 2012
June
Week 23 • Week 24 • Week 25 • Week 26Week 24: June 11th to 17th
Goal- Progress of ODEs on the AHL-LuxR circuit
- First complete modeling report about the AHL-LuxR circuit
- Stability analysis of the AHL-LuxR circuit
-
The ODEs are not already set but the report is done. The stability analysis lead to the fact that the system is locally stable. We could not tell if it's globally stable or not.