Team:METU/Timeline

From 2012.igem.org

(Difference between revisions)
Line 1: Line 1:
<html lang="en-US" xmlns="http://www.w3.org/1999/xhtml" dir="ltr">
<html lang="en-US" xmlns="http://www.w3.org/1999/xhtml" dir="ltr">
-
<head>
+
    <head>
-
<meta http-equiv="Content-type" content="text/html; charset=utf-8" />
+
        <meta http-equiv="Content-type" content="text/html; charset=utf-8" />
-
 
 
         <link rel="shortcut icon" href="http://simsekburak.com/hasan/css/images/favicon.ico" />
         <link rel="shortcut icon" href="http://simsekburak.com/hasan/css/images/favicon.ico" />
-
<link rel="stylesheet" href="http://simsekburak.com/hasan/css/style.css" type="text/css" media="all" />
+
        <link rel="stylesheet" href="http://simsekburak.com/hasan/css/style.css" type="text/css" media="all" />
-
<!--[if IE 6]>
+
        <!--[if IE 6]>
-
<link rel="stylesheet" href="css/ie6.css" type="text/css" media="all" />
+
                <link rel="stylesheet" href="css/ie6.css" type="text/css" media="all" />
-
<script src="http://simsekburak.com/hasan/js/png-fix.js" type="text/javascript"></script>
+
                <script src="http://simsekburak.com/hasan/js/png-fix.js" type="text/javascript"></script>
-
<![endif]-->
+
        <![endif]-->
-
<script src="http://simsekburak.com/hasan/js/jquery-1.4.2.js" type="text/javascript"></script>
+
        <script src="http://simsekburak.com/hasan/js/jquery-1.4.2.js" type="text/javascript"></script>
-
<script src="http://simsekburak.com/hasan/js/jquery.jcarousel.js" type="text/javascript"></script>
+
        <script src="http://simsekburak.com/hasan/js/jquery.jcarousel.js" type="text/javascript"></script>
-
<script src="http://simsekburak.com/hasan/js/js-func.js" type="text/javascript"></script>
+
        <script src="http://simsekburak.com/hasan/js/js-func.js" type="text/javascript"></script>
-
<style>
+
        <style>
-
h1.firstHeading, div#p-logo, div#search-controls, div#contentSub, div#footer-box, div#catlinks{
+
            h1.firstHeading, div#p-logo, div#search-controls, div#contentSub, div#footer-box, div#catlinks{
-
  display:none;
+
                display:none;
-
}
+
            }
 +
            #top-section{
 +
                height: 20px !important;
 +
                border: none !important;
 +
            }
 +
            div#content{
 +
                padding: 0 !important;
 +
                background: transparent;
 +
                border: none !important;
 +
                width: auto;
 +
            }
 +
        </style>
-
#top-section{
 
-
height: 20px !important;
 
-
border: none !important;
 
-
}
 
-
div#content{
+
    </head>
-
padding: 0 !important;
+
    <body>
-
background: transparent;
+
        <!-- Header -->
-
border: none !important;
+
        <div id="header">
-
width: auto;
+
            <div class="shell">
-
}
+
                <h1 id="logo" class="notext"><a href="https://2012.igem.org/Team:METU/test">
 +
                        <img width="200px" height="104px" src="/wiki/images/2/22/METU_logo.png" style="padding-top: 10px;"></img>
 +
                    </a>
 +
                </h1>
 +
                <h1 id="logo2" class="notext"><a href="https://2012.igem.org/Main_Page">
 +
                        <img width="144px" height="109px" src="/wiki/images/0/08/Igem_logo.png" style="padding-top: 25px;"></img>></a></h1>
 +
                <div id="navigation">
 +
                    <ul>
 +
                        <li><a href="https://2012.igem.org/Team:METU/test" class="active"><span>Home</span></a></li>
-
</style>
+
                        <li><a href="https://2012.igem.org/Team:METU/test/Team"><span>Team</span></a></li>
 +
                        <li><a href="https://2012.igem.org/Team:METU/test/CODH"><span>CODH</span></a>
 +
                            <div class="dd-holder">
 +
                                <div class="dd-t"></div>
 +
                                <div class="dd">
 +
                                    <ul>
 +
                                        <li><a href="https://2012.igem.org/Team:METU/test/CODH#Overview">Overview</a></li>
 +
                                        <li><a href="https://2012.igem.org/Team:METU/test/CODH#Modelling">Modelling</a></li>
 +
                                        <li><a href="https://2012.igem.org/Team:METU/test/CODH#Results">Results</a></li>
 +
                                        <li><a href="https://2012.igem.org/Team:METU/test/CODH#Biobricks">Biobricks</a></li>
 +
                                    </ul>
 +
                                    <div class="cl">&nbsp;</div>
 +
                                </div>
 +
                                <div class="dd-b"></div>
 +
                            </div>
 +
                        </li>
 +
                        <li><a href="https://2012.igem.org/Team:METU/test/KillSwitchOverview"><span>Kill-Switch</span></a>
 +
                            <div class="dd-holder">
 +
                                <div class="dd-t"></div>
 +
                                <div class="dd">
 +
                                    <ul>
 +
                                        <li><a href="https://2012.igem.org/Team:METU/test/KillSwitchOverview#Overview">Overview</a></li>
 +
                                        <li><a href="https://2012.igem.org/Team:METU/KillSwitch/Modelling#Modelling">Modelling</a></li>
 +
                                        <li><a href="https://2012.igem.org/Team:METU/test/KillSwitchOverview#Results">Results</a></li>
 +
                                        <li><a href="https://2012.igem.org/Team:METU/test/KillSwitchOverview#Biobricks">Biobricks</a></li>
-
</head>
+
                                    </ul>
-
<body>
+
                                    <div class="cl">&nbsp;</div>
-
<!-- Header -->
+
                                </div>
-
<div id="header">
+
                                <div class="dd-b"></div>
-
<div class="shell">
+
                            </div>
-
<h1 id="logo" class="notext"><a href="https://2012.igem.org/Team:METU/test">
+
                        </li>
-
<img width="200px" height="104px" src="/wiki/images/2/22/METU_logo.png" style="padding-top: 10px;">
+
-
</a>
+
-
</h1>
+
-
<h1 id="logo2" class="notext"><a href="https://2012.igem.org/Main_Page">
+
-
<img width="144px" height="109px" src="/wiki/images/0/08/Igem_logo.png" style="padding-top: 25px;"></a></h1>
+
-
<div id="navigation">
+
-
<ul>
+
-
    <li><a href="https://2012.igem.org/Team:METU/test" class="active"><span>Home</span></a></li>
+
-
    <li><a href="https://2012.igem.org/Team:METU/test/Team"><span>Team</span></a></li>
+
                        <li><a href="https://2012.igem.org/Team:METU/test/CellLimiter"><span>Cell Limiter</span></a>
-
    <li><a href="https://2012.igem.org/Team:METU/test/CODH"><span>CODH</span></a>
+
                            <div class="dd-holder">
-
<div class="dd-holder">
+
                                <div class="dd-t"></div>
-
<div class="dd-t"></div>
+
                                <div class="dd">
-
<div class="dd">
+
                                    <ul>
-
<ul>
+
                                        <li><a href="https://2012.igem.org/Team:METU/test/CellLimiter#Overview">Overview</a></li>
-
<li><a href="https://2012.igem.org/Team:METU/test/CODH#Overview">Overview</a></li>
+
                                        <li><a href="https://2012.igem.org/Team:METU/test/CellLimiter#Modelling">Modelling</a></li>
-
<li><a href="https://2012.igem.org/Team:METU/test/CODH#Modelling">Modelling</a></li>
+
                                        <li><a href="https://2012.igem.org/Team:METU/test/CellLimiter#Results">Results</a></li>
-
<li><a href="https://2012.igem.org/Team:METU/test/CODH#Results">Results</a></li>
+
                                        <li><a href="https://2012.igem.org/Team:METU/test/CellLimiter#Biobricks">Biobricks</a></li>
-
<li><a href="https://2012.igem.org/Team:METU/test/CODH#Biobricks">Biobricks</a></li>
+
-
+
-
    </ul>
+
-
    <div class="cl">&nbsp;</div>
+
-
    </div>
+
-
    <div class="dd-b"></div>
+
-
    </div>
+
-
    </li>
+
-
    <li><a href="https://2012.igem.org/Team:METU/test/KillSwitchOverview"><span>Kill-Switch</span></a>
+
-
<div class="dd-holder">
+
-
<div class="dd-t"></div>
+
-
<div class="dd">
+
-
<ul>
+
-
<li><a href="https://2012.igem.org/Team:METU/test/KillSwitchOverview#Overview">Overview</a></li>
+
-
<li><a href="https://2012.igem.org/Team:METU/KillSwitch/Modelling#Modelling">Modelling</a></li>
+
-
<li><a href="https://2012.igem.org/Team:METU/test/KillSwitchOverview#Results">Results</a></li>
+
-
<li><a href="https://2012.igem.org/Team:METU/test/KillSwitchOverview#Biobricks">Biobricks</a></li>
+
-
+
-
    </ul>
+
-
    <div class="cl">&nbsp;</div>
+
-
    </div>
+
-
    <div class="dd-b"></div>
+
-
    </div>
+
-
    </li>
+
-
+
-
<li><a href="https://2012.igem.org/Team:METU/test/CellLimiter"><span>Cell Limiter</span></a>
+
-
<div class="dd-holder">
+
-
<div class="dd-t"></div>
+
-
<div class="dd">
+
-
<ul>
+
-
<li><a href="https://2012.igem.org/Team:METU/test/CellLimiter#Overview">Overview</a></li>
+
-
<li><a href="https://2012.igem.org/Team:METU/test/CellLimiter#Modelling">Modelling</a></li>
+
-
<li><a href="https://2012.igem.org/Team:METU/test/CellLimiter#Results">Results</a></li>
+
-
<li><a href="https://2012.igem.org/Team:METU/test/CellLimiter#Biobricks">Biobricks</a></li>
+
-
+
-
    </ul>
+
-
    <div class="cl">&nbsp;</div>
+
-
    </div>
+
-
    <div class="dd-b"></div>
+
-
    </div>
+
-
    </li>
+
-
+
-
    <li><a href="https://2012.igem.org/Team:METU/test/Overview"><span>Notebook</span></a>
+
-
<div class="dd-holder">
+
-
<div class="dd-t"></div>
+
-
<div class="dd">
+
-
<ul>
+
-
<li><a href="https://2012.igem.org/Team:METU/test/Overview">Overview</a></li>
+
-
<li><a href="/Team:METU/Timeline">Timeline</a></li>
+
-
<li><a href="/Team:METU/Brainstorm">Brainstorm</a></li>
+
-
<li><a href="https://2012.igem.org/Team:METU/test/Protocols">Protocols</a></li>
+
-
<li><a href="/Team:METU/CloningPlan">Cloning Plan</a></li>
+
-
<li class="last"><a href="/Team:METU/Judging">Judging</a></li>
+
-
    </ul>
+
-
    <div class="cl">&nbsp;</div>
+
-
    </div>
+
-
    <div class="dd-b"></div>
+
-
    </div>
+
-
    </li>
+
-
    <li><a href="#"><span>Human Practice</span></a>
+
-
<div class="dd-holder">
+
-
<div class="dd-t"></div>
+
-
<div class="dd">
+
-
<ul>
+
-
<li><a href="https://2012.igem.org/Team:METU/Gallery">Gallery</a></li>
+
-
<li class="last"><a href="/Team:METU/Activities">Activities</a></li>
+
-
    </ul>
+
-
    <div class="cl">&nbsp;</div>
+
-
    </div>
+
-
    <div class="dd-b"></div>
+
-
    </div>
+
-
    </li>
+
-
<li><a href="#"><span>Extras</span></a>
+
-
<div class="dd-holder">
+
-
<div class="dd-t"></div>
+
-
<div class="dd">
+
-
<ul>
+
-
<li><a href="/Team:METU/Safety">Safety</a></li>
+
-
+
-
<li class="last"><a href="/Team:METU/Attributions">Attributions</a></li>
+
-
    </ul>
+
-
    <div class="cl">&nbsp;</div>
+
-
    </div>
+
-
    <div class="dd-b"></div>
+
-
    </div>
+
-
+
-
</li>
+
-
</ul>
+
-
</div>
+
-
<div class="cl">&nbsp;</div>
+
-
<!-- <div class="search">
+
-
<form action="#" method="post">
+
-
<span class="field">
+
-
<input type="text" class="blink" value="Search" title="Search" />
+
-
</span>
+
-
<input type="submit" class="search-btn notext" value="Submit" />
+
-
</form>
+
-
</div> 
+
-
-->
+
-
</div>
+
                                    </ul>
-
</div>
+
                                    <div class="cl">&nbsp;</div>
-
<!-- End Header -->
+
                                </div>
-
<!-- Slider -->
+
                                <div class="dd-b"></div>
-
<div id="slider2">
+
                            </div>
-
<div class="shell">
+
                        </li>
-
<div class="slider-holder2">
+
-
<h1>Timeline</h1>
+
-
<div class="cl">&nbsp;</div>
+
-
+
-
</div>
+
-
</div>
+
-
</div>
+
-
<!-- End Slider -->
+
-
<!-- Main -->
+
-
<div id="main">
+
-
<div class="shell">
+
-
<!-- team basladi -->
+
-
<div id="metin2">
+
                        <li><a href="https://2012.igem.org/Team:METU/test/Overview"><span>Notebook</span></a>
 +
                            <div class="dd-holder">
 +
                                <div class="dd-t"></div>
 +
                                <div class="dd">
 +
                                    <ul>
 +
                                        <li><a href="https://2012.igem.org/Team:METU/test/Overview">Overview</a></li>
 +
                                        <li><a href="/Team:METU/Timeline">Timeline</a></li>
 +
                                        <li><a href="/Team:METU/Brainstorm">Brainstorm</a></li>
 +
                                        <li><a href="https://2012.igem.org/Team:METU/test/Protocols">Protocols</a></li>
 +
                                        <li><a href="/Team:METU/CloningPlan">Cloning Plan</a></li>
 +
                                        <li class="last"><a href="/Team:METU/Judging">Judging</a></li>
 +
                                    </ul>
 +
                                    <div class="cl">&nbsp;</div>
 +
                                </div>
 +
                                <div class="dd-b"></div>
 +
                            </div>
 +
                        </li>
 +
                        <li><a href="#"><span>Human Practice</span></a>
 +
                            <div class="dd-holder">
 +
                                <div class="dd-t"></div>
 +
                                <div class="dd">
 +
                                    <ul>
 +
                                        <li><a href="https://2012.igem.org/Team:METU/Gallery">Gallery</a></li>
 +
                                        <li class="last"><a href="/Team:METU/Activities">Activities</a></li>
 +
                                    </ul>
 +
                                    <div class="cl">&nbsp;</div>
 +
                                </div>
 +
                                <div class="dd-b"></div>
 +
                            </div>
 +
                        </li>
 +
                        <li><a href="#"><span>Extras</span></a>
 +
                            <div class="dd-holder">
 +
                                <div class="dd-t"></div>
 +
                                <div class="dd">
 +
                                    <ul>
 +
                                        <li><a href="/Team:METU/Safety">Safety</a></li>
-
<p><font face="tahoma" size="6" color="maroon">
+
                                        <li class="last"><a href="/Team:METU/Attributions">Attributions</a></li>
-
<b>December,2011</b></font><p>
+
                                    </ul>
-
&nbsp;
+
                                    <div class="cl">&nbsp;</div>
-
<p> <p><font face="tahoma" size="3" color="maroon">
+
                                </div>
-
<b>11.12.2011</b></font> :First Meeting
+
                                <div class="dd-b"></div>
-
Today the all that responded our announcements to be a part of the iGEM competition representing the METU-IGEM team got together for the first time. In total we have got 50 interested students, 2 instructors and 1 adviser. We started by introducing ourselves then we talked about our past IGEM experiences. Here, with the audiences we decided to make a brainstorming session which should be after reading enough about more on synthetic biology. Furthermore, we decided to make a brainstorming session to decide on our project after 1 week.
+
                            </div>
-
<p>
+
-
<p><p> <p><font face="tahoma" size="3" color="maroon">
+
                        </li>  
-
<b>18.12.2011</b></font>: Brainstorming Session Part 1:
+
                    </ul>
-
To make a successful plan we know that the first think should be done is coming together and adding the ideas each other. In the first part of the brainstorming we simply think everything and write them on the board! (add the photo 1)
+
                </div>
-
<p>
+
                <div class="cl">&nbsp;</div>
 +
                <!-- <div class="search">
 +
                                <form action="#" method="post">
 +
                                        <span class="field">
 +
                                                <input type="text" class="blink" value="Search" title="Search" />
 +
                                        </span>
 +
                                        <input type="submit" class="search-btn notext" value="Submit" />
 +
                                </form>
 +
                        </div> 
 +
                -->
 +
            </div>
 +
        </div>
 +
        <!-- End Header -->
 +
        <!-- Slider -->
 +
        <div id="slider2">
 +
            <div class="shell">
 +
                <div class="slider-holder2">
 +
                    <h1>Timeline</h1>
 +
                    <div class="cl">&nbsp;</div>
-
<p><p><p> <p><font face="tahoma" size="3" color="maroon">
+
                </div>
-
<b>25.12.2011</b></font>: Brainstorming Session Part 2:
+
            </div>
-
In the second part of the brainstorming we continue to storm the ideas and writing down to the board. Then we made a schedule to think the ideas for their feasibility and if it is possible making circuits of the plans. (add the photo 2)
+
        </div>
-
<p>
+
        <!-- End Slider -->
-
&nbsp;
+
        <!-- Main -->
-
&nbsp;
+
        <div id="main">
 +
            <div class="shell">
 +
                <!-- team basladi -->
-
<p><font face="tahoma" size="6" color="maroon">
+
                <div id="metin2">
-
<b>January,2012</b></font><p>
+
-
&nbsp;
+
-
<p><p><p> <p><font face="tahoma" size="3" color="maroon">
+
-
<b>03.01.2012</b></font>: Eliminating the Ideas:
+
-
The imagination of our team was extremely high because ,our team consists mainly first and second year students. At the end of the brainstorming sessions, there were lots of crazy ideas; however, we had to eliminate them. Finally we ended up with two main project. By trying to choose our main project, the several managerial tasks were divided among the team members. By doing so everyone got the chance to use their experience while learning from each other. Then we divided our team as a 4 different sub-groups;
+
-
<p>
+
-
&nbsp;
+
                    <p><font face="tahoma" size="6" color="maroon">
-
&nbsp;
+
                            <b>December,2011</b></font><p>
-
<p><font face="tahoma" size="6" color="maroon">
+
                            &nbsp;
-
<b>February,2012</b></font><p>
+
                            <p> <p><font face="tahoma" size="3" color="maroon">
-
&nbsp;
+
                                        <b>11.12.2011</b></font> :First Meeting
-
<p>
+
                                    Today the all that responded our announcements to be a part of the iGEM competition representing the METU-IGEM team got together for the first time. In total we have got 50 interested students, 2 instructors and 1 adviser. We started by introducing ourselves then we talked about our past IGEM experiences. Here, with the audiences we decided to make a brainstorming session which should be after reading enough about more on synthetic biology. Furthermore, we decided to make a brainstorming session to decide on our project after 1 week.  
-
<p><font face="tahoma" size="3" color="maroon">
+
                                    <p>
-
<b>13.02.2012</b></font>: Article Reading
+
-
In the middle of the semester holiday, we did a meeting to give some homework to team members. We decided to prepare an article pool about our two main projects. By collecting information, we could have decided which one was more possible or which parts we had to add or remove from our projects.
+
-
<p>
+
-
<p>
+
-
<p><font face="tahoma" size="3" color="maroon">
+
-
<b>27.02.2012</b></font>: Deciding to main project “ CO FILTER”
+
-
After semester holiday, we had read and summarized so many articles. With this huge amount of information we prepared lots of presentations to transfer the information and to discuss about them.  After reading and discussing the so many articles related to our two main topics, we chose CO filter as our main project.  
+
-
<p>
+
-
&nbsp;
+
-
&nbsp;
+
-
<p><font face="tahoma" size="6" color="maroon">
+
                                        <p><p> <p><font face="tahoma" size="3" color="maroon">
-
<b>March,2012</b></font><p>
+
                                                        <b>18.12.2011</b></font>: Brainstorming Session Part 1:
 +
                                                    To make a successful plan we know that the first think should be done is coming together and adding the ideas each other. In the first part of the brainstorming we simply think everything and write them on the board! (add the photo 1)
 +
                                                    <p>
-
&nbsp;
 
-
<p><p><font face="tahoma" size="3" color="maroon">
 
-
<b>06.03.2012</b></font>: To build the system of our project
 
-
Because our team members were inexperienced ,we had mini classes in which the basis of genetic engineering is taught. After this time, we all were excellent article readers. We tried to access all possible information about our project and try to build up the system, by finding available promoters ,genes,etc.  We finally built the system and we presented it to our advisors.
 
-
<p>
 
-
<p><p><font face="tahoma" size="3" color="maroon">
+
                                                        <p><p><p> <p><font face="tahoma" size="3" color="maroon">
-
<b>13.03.2012</b></font>: Searching for sponsorship
+
                                                                            <b>25.12.2011</b></font>: Brainstorming Session Part 2:
-
Just after deciding our project, we started to search for sponsorship for our team. We started to make telephone calls to every single company or government unit about our project. In this time , we started to search for a new lab.
+
                                                                        In the second part of the brainstorming we continue to storm the ideas and writing down to the board. Then we made a schedule to think the ideas for their feasibility and if it is possible making circuits of the plans. (add the photo 2)
-
<p>
+
                                                                        <p>
 +
                                                                            &nbsp;
 +
                                                                            &nbsp;
-
<p><p><font face="tahoma" size="3" color="maroon">
+
                                                                            <p><font face="tahoma" size="6" color="maroon">
-
<b>20.03.2012</b></font>: Building our own iGEM laboratory
+
                                                                                    <b>January,2012</b></font><p>
-
Our instructor ,Mrs. Akkaya had already  offered her lab for our experiments. However, this wasn’t enough for us. So after this search, we found a new lab in the basement of Chemistry Building. This lab was being used as storage for this building and was full of unnecessary stuff. By the time, we collected the last parts of our system and we all started to clean our new lab.(temizlik resimleri)
+
                                                                                    &nbsp;
-
<p>
+
                                                                                    <p><p><p> <p><font face="tahoma" size="3" color="maroon">
 +
                                                                                                        <b>03.01.2012</b></font>: Eliminating the Ideas:
 +
                                                                                                    The imagination of our team was extremely high because ,our team consists mainly first and second year students. At the end of the brainstorming sessions, there were lots of crazy ideas; however, we had to eliminate them. Finally we ended up with two main project. By trying to choose our main project, the several managerial tasks were divided among the team members. By doing so everyone got the chance to use their experience while learning from each other. Then we divided our team as a 4 different sub-groups;
 +
                                                                                                    <p>
 +
                                                                                                        &nbsp;
 +
                                                                                                        &nbsp;
 +
                                                                                                        <p><font face="tahoma" size="6" color="maroon">
 +
                                                                                                                <b>February,2012</b></font><p>
 +
                                                                                                                &nbsp;
 +
                                                                                                                <p>
 +
                                                                                                                    <p><font face="tahoma" size="3" color="maroon">
 +
                                                                                                                            <b>13.02.2012</b></font>: Article Reading
 +
                                                                                                                        In the middle of the semester holiday, we did a meeting to give some homework to team members. We decided to prepare an article pool about our two main projects. By collecting information, we could have decided which one was more possible or which parts we had to add or remove from our projects.
 +
                                                                                                                        <p>
 +
                                                                                                                            <p>
 +
                                                                                                                                <p><font face="tahoma" size="3" color="maroon">
 +
                                                                                                                                        <b>27.02.2012</b></font>: Deciding to main project ӠCO FILTERԍ
 +
                                                                                                                                    After semester holiday, we had read and summarized so many articles. With this huge amount of information we prepared lots of presentations to transfer the information and to discuss about them.  After reading and discussing the so many articles related to our two main topics, we chose CO filter as our main project.
 +
                                                                                                                                    <p>
 +
                                                                                                                                        &nbsp;
 +
                                                                                                                                        &nbsp;
-
&nbsp;
+
                                                                                                                                        <p><font face="tahoma" size="6" color="maroon">
-
&nbsp;
+
                                                                                                                                                <b>March,2012</b></font><p>
-
<p><font face="tahoma" size="6" color="maroon">
+
                                                                                                                                                &nbsp;
-
<b>April,2012</b></font><p>
+
                                                                                                                                                <p><p><font face="tahoma" size="3" color="maroon">
-
&nbsp;
+
                                                                                                                                                            <b>06.03.2012</b></font>: To build the system of our project
-
<p><p><font face="tahoma" size="3" color="maroon">
+
                                                                                                                                                        Because our team members were inexperienced ,we had mini classes in which the basis of genetic engineering is taught. After this time, we all were excellent article readers. We tried to access all possible information about our project and try to build up the system, by finding available promoters ,genes,etc. We finally built the system and we presented it to our advisors.  
-
<b>04.04.2012</b></font>: software meetings
+
                                                                                                                                                        <p>
-
Our software team started to do their own meetings. At first , they gather information about the model of our project. At the same time, they started to discussions about the design of our wiki page. By this time, they design a draft logo which is: (eski logo resmi)
+
-
<p>
+
-
<p><p><font face="tahoma" size="3" color="maroon">
+
                                                                                                                                                            <p><p><font face="tahoma" size="3" color="maroon">
-
<b>11.04.2012</b></font>: human practice meetings
+
                                                                                                                                                                        <b>13.03.2012</b></font>: Searching for sponsorship
-
At this time, human practice sub team started to collect their ideas and present them to all group members. They made lots of presentation about their projects. Moreover, they implemented almost all of their ideas; making a short movie, organizing a iGEM party and a picnic with the other iGEM team of Turkey:Baskent University team,going to funfair to tell people about iGEM,etc.
+
                                                                                                                                                                    Just after deciding our project, we started to search for sponsorship for our team. We started to make telephone calls to every single company or government unit about our project. In this time , we started to search for a new lab.
-
<p>
+
                                                                                                                                                                    <p>
-
<p><p><font face="tahoma" size="3" color="maroon">
+
                                                                                                                                                                        <p><p><font face="tahoma" size="3" color="maroon">
-
<b>18.04.2012</b></font>: Hardworking  software team
+
                                                                                                                                                                                    <b>20.03.2012</b></font>: Building our own iGEM laboratory
-
Software team was arranging lots of meetings to talk about the design of our wiki page and the logo. After so many crazy ideas we ended with our current logo :…After deciding our logo, software team started to ask the ideas of all team about wiki design.
+
                                                                                                                                                                                Our instructor ,Mrs. Akkaya had already  offered her lab for our experiments. However, this wasnӴ enough for us. So after this search, we found a new lab in the basement of Chemistry Building. This lab was being used as storage for this building and was full of unnecessary stuff. By the time, we collected the last parts of our system and we all started to clean our new lab.(temizlik resimleri)
-
<p>
+
                                                                                                                                                                                <p>
-
<p>
 
-
<p><font face="tahoma" size="3" color="maroon">
 
-
<b>25.04.2012</b></font>: : Meetings with presidency of METU
 
-
Our funding team arranged meetings with rector of our university. After those meetings, we found some money necessary for our wet lab practices.
 
-
<p>
 
-
&nbsp;
 
-
&nbsp;
 
-
<p><font face="tahoma" size="6" color="maroon">
+
                                                                                                                                                                                    &nbsp;
-
<b>May,2012</b></font><p>
+
                                                                                                                                                                                    &nbsp;
-
<p>
+
-
&nbsp;
+
-
<p><p><font face="tahoma" size="3" color="maroon">
+
-
<b>02.05.2012</b></font>:Readdyyy for wet lab!!
+
-
After cleaning, we designed our laboratory .Because our lab was a radioactive working place, we had to remove lots of stuff and check whole lab for radioactive substances. Because of our limited budget ,we can only place an old PCR machine named as UMUT. Then we had opened the box sent by iGEM with big excitement for the first time.
+
-
<p>
+
-
<p>
+
                                                                                                                                                                                    <p><font face="tahoma" size="6" color="maroon">
-
<p><p><font face="tahoma" size="3" color="maroon">
+
                                                                                                                                                                                            <b>April,2012</b></font><p>
-
<b>09.05.2012</b></font>: let’s go into autoclave together!!
+
                                                                                                                                                                                            &nbsp;
-
We all introduced with autoclave at this times. All equipment that we had collected was autoclaved patiently and this procedure has been done often up to now.  
+
                                                                                                                                                                                            <p><p><font face="tahoma" size="3" color="maroon">
-
<p>
+
                                                                                                                                                                                                        <b>04.04.2012</b></font>: software meetings
 +
                                                                                                                                                                                                    Our software team started to do their own meetings. At first , they gather information about the model of our project. At the same time, they started to discussions about the design of our wiki page. By this time, they design a draft logo which is: (eski logo resmi)
 +
                                                                                                                                                                                                    <p>
-
<p>
+
                                                                                                                                                                                                        <p><p><font face="tahoma" size="3" color="maroon">
-
<p><p><font face="tahoma" size="3" color="maroon">
+
                                                                                                                                                                                                        <b>11.04.2012</b></font>: human practice meetings
-
<b>23.05.2012</b></font>: Preparing plates..
+
                                                                                                                                                                                                        At this time, human practice sub team started to collect their ideas and present them to all group members. They made lots of presentation about their projects. Moreover, they implemented almost all of their ideas; making a short movie, organizing a iGEM party and a picnic with the other iGEM team of Turkey:Baskent University team,going to funfair to tell people about iGEM,etc.
-
As a beginning of our wet lab work, we prepared lots of plates with agar medium.  It was necessary to prepare them continuously during our working period. The first preparation was so excited for every one of us; however after time passing, this part has become the most boring part of study.
+
                                                                                                                                                                                                        <p>
-
<p>
+
-
&nbsp;
+
-
&nbsp;
+
-
<p><font face="tahoma" size="6" color="maroon">
+
-
<b>June,2012</b></font><p>
+
-
<p>
+
-
&nbsp;
+
-
<p><p><font face="tahoma" size="3" color="maroon">
+
-
<b>06.06.2012</b></font>: Lab cleaning List
+
-
We all had started to live and work in this lab, so we have to keep it clean. We made a cleaning list and paste it on to our door. And we arrange a post stage for our lab notes. (resimler) And as a compulsory work, we had to have a lab notebook to write down all procedures.
+
-
<p>
+
-
<p>
+
-
<p><p><font face="tahoma" size="3" color="maroon">
+
-
<b>13.06.2012</b></font>:Now Transformation List
+
-
From iGEM kit we started to extract our parts and after diluting store them in fridges. Addition to this, we prepared competent cell series. Because we are very crowded wet lab team , we had to divide people into sub groups for transformation.
+
-
<p>
+
-
<p>
+
                                                                                                                                                                                                        <p><p><font face="tahoma" size="3" color="maroon">
-
<p><p><font face="tahoma" size="3" color="maroon">
+
                                                                                                                                                                                                        <b>18.04.2012</b></font>: Hardworking  software team
-
<b>14.06.2012</b></font>: Protocols, have you seen my protocols?
+
                                                                                                                                                                                                        Software team was arranging lots of meetings to talk about the design of our wiki page and the logo. After so many crazy ideas we ended with our current logo :Ɓfter deciding our logo, software team started to ask the ideas of all team about wiki design.
-
The senior members of our team started to search for their reliable protocols. We collected all protocols that we could find. Then we copied all to our lab notebooks?
+
                                                                                                                                                                                                        <p>
-
<p>
+
-
<p><p><p><font face="tahoma" size="3" color="maroon">
+
                                                                                                                                                                                                        <p>
-
<b>15.06.2012</b></font>: Competent cells were prepared according to our protocol. A new list was done to do competent cell.
+
                                                                                                                                                                                                        <p><font face="tahoma" size="3" color="maroon">
-
<p>
+
                                                                                                                                                                                                        <b>25.04.2012</b></font>: : Meetings with presidency of METU
 +
                                                                                                                                                                                                        Our funding team arranged meetings with rector of our university. After those meetings, we found some money necessary for our wet lab practices.
 +
                                                                                                                                                                                                        <p>
 +
                                                                                                                                                                                                        &nbsp;
 +
                                                                                                                                                                                                        &nbsp;
-
<p><p><font face="tahoma" size="3" color="maroon">
+
                                                                                                                                                                                                        <p><font face="tahoma" size="6" color="maroon">
-
<b>16.06.2012</b></font>:Let the transformations begin!
+
                                                                                                                                                                                                        <b>May,2012</b></font><p>
-
All the members of our team started to learn how to do transformation. All parts, removed and diluted, were ready to do transformation. There were almost ten groups for doing transformation. All started to their work one by one.
+
                                                                                                                                                                                                        <p>
-
<p>
+
                                                                                                                                                                                                        &nbsp;
-
+
                                                                                                                                                                                                        <p><p><font face="tahoma" size="3" color="maroon">
-
<p><p><font face="tahoma" size="3" color="maroon">
+
                                                                                                                                                                                                        <b>02.05.2012</b></font>:Readdyyy for wet lab!!
-
<b>18.06.2012</b></font>:We did the transformation of PLasR and JD.
+
                                                                                                                                                                                                        After cleaning, we designed our laboratory .Because our lab was a radioactive working place, we had to remove lots of stuff and check whole lab for radioactive substances. Because of our limited budget ,we can only place an old PCR machine named as UMUT. Then we had opened the box sent by iGEM with big excitement for the first time.
-
<p>
+
                                                                                                                                                                                                        <p>
-
<p><p><font face="tahoma" size="3" color="maroon">
+
                                                                                                                                                                                                        <p>
-
<b>19.06.2012</b></font>: Transformation of CI and Elowitz were done by second group.
+
                                                                                                                                                                                                        <p><p><font face="tahoma" size="3" color="maroon">
-
<p>
+
                                                                                                                                                                                                        <b>09.05.2012</b></font>: letӳ go into autoclave together!!
 +
                                                                                                                                                                                                        We all introduced with autoclave at this times. All equipment that we had collected was autoclaved patiently and this procedure has been done often up to now.  
 +
                                                                                                                                                                                                        <p>
-
<p><p><font face="tahoma" size="3" color="maroon">
+
                                                                                                                                                                                                        <p>
-
<b>20.06.2012</b></font>: KS and RBS were done ,too.
+
                                                                                                                                                                                                        <p><p><font face="tahoma" size="3" color="maroon">
-
<p>
+
                                                                                                                                                                                                        <b>23.05.2012</b></font>: Preparing plates..
 +
                                                                                                                                                                                                        As a beginning of our wet lab work, we prepared lots of plates with agar medium.  It was necessary to prepare them continuously during our working period. The first preparation was so excited for every one of us; however after time passing, this part has become the most boring part of study.
 +
                                                                                                                                                                                                        <p>
 +
                                                                                                                                                                                                        &nbsp;
 +
                                                                                                                                                                                                        &nbsp;
 +
                                                                                                                                                                                                        <p><font face="tahoma" size="6" color="maroon">
 +
                                                                                                                                                                                                        <b>June,2012</b></font><p>
 +
                                                                                                                                                                                                        <p>
 +
                                                                                                                                                                                                        &nbsp;
 +
                                                                                                                                                                                                        <p><p><font face="tahoma" size="3" color="maroon">
 +
                                                                                                                                                                                                        <b>06.06.2012</b></font>: Lab cleaning List
 +
                                                                                                                                                                                                        We all had started to live and work in this lab, so we have to keep it clean. We made a cleaning list and paste it on to our door. And we arrange a post stage for our lab notes. (resimler) And as a compulsory work, we had to have a lab notebook to write down all procedures.
 +
                                                                                                                                                                                                        <p>
 +
                                                                                                                                                                                                        <p>
 +
                                                                                                                                                                                                        <p><p><font face="tahoma" size="3" color="maroon">
 +
                                                                                                                                                                                                        <b>13.06.2012</b></font>:Now Transformation List
 +
                                                                                                                                                                                                        From iGEM kit we started to extract our parts and after diluting store them in fridges. Addition to this, we prepared competent cell series. Because we are very crowded wet lab team , we had to divide people into sub groups for transformation.
 +
                                                                                                                                                                                                        <p>
-
<p><p><font face="tahoma" size="3" color="maroon">
+
                                                                                                                                                                                                        <p>
-
<b>21.06.2012</b></font>: Plates were cleaned and the contaminated LB was poured.
+
                                                                                                                                                                                                        <p><p><font face="tahoma" size="3" color="maroon">
-
<p>
+
                                                                                                                                                                                                        <b>14.06.2012</b></font>: Protocols, have you seen my protocols?
-
<p><p><font face="tahoma" size="3" color="maroon">
+
                                                                                                                                                                                                        The senior members of our team started to search for their reliable protocols. We collected all protocols that we could find. Then we copied all to our lab notebooks?
-
<b>22.06.2012</b></font>: Meeting Time
+
                                                                                                                                                                                                        <p>
-
o Were these protocols true , why didn’t they work, who are we :S
+
-
All transformations, except Berke`s , were failed. So we started to change our protocols and repeated all procedures with these new protocols. After that time, transformations started to work.
+
-
o Funding team;
+
-
They all started to telephone calls to companies. They found some companies who are ready to help us . And they arranged meetings  with Güven Vakfi , Vendeka and GÖZDELERRIN SIRKETI. Also they collect the information for application of TUBITAK.
+
-
<p>
+
-
<p><p><font face="tahoma" size="3" color="maroon">
+
                                                                                                                                                                                                        <p><p><p><font face="tahoma" size="3" color="maroon">
-
<b>23.06.2012</b></font>: With new protocols  transformations were started to repeat.
+
                                                                                                                                                                                                        <b>15.06.2012</b></font>: Competent cells were prepared according to our protocol. A new list was done to do competent cell.
-
<p>
+
                                                                                                                                                                                                        <p>
-
<p><p><font face="tahoma" size="3" color="maroon">
+
                                                                                                                                                                                                        <p><p><font face="tahoma" size="3" color="maroon">
-
<b>24.06.2012</b></font>: With our new protocol , the transformation of PLasR and JD were succeed.
+
                                                                                                                                                                                                        <b>16.06.2012</b></font>:Let the transformations begin!
-
<p>
+
                                                                                                                                                                                                        All the members of our team started to learn how to do transformation. All parts, removed and diluted, were ready to do transformation. There were almost ten groups for doing transformation. All started to their work one by one.
 +
                                                                                                                                                                                                        <p>
-
<p><p><font face="tahoma" size="3" color="maroon">
+
                                                                                                                                                                                                        <p><p><font face="tahoma" size="3" color="maroon">
-
<b>25.06.2012</b></font>: The parts,CI and Elowitz, were also done .
+
                                                                                                                                                                                                        <b>18.06.2012</b></font>:We did the transformation of PLasR and JD.
-
<p>
+
                                                                                                                                                                                                        <p>
-
<p><p><font face="tahoma" size="3" color="maroon">
+
                                                                                                                                                                                                        <p><p><font face="tahoma" size="3" color="maroon">
-
<b>26.06.2012</b></font>: 26.06.2012: Our third group also succeeded the transformation of KS and RBS parts.
+
                                                                                                                                                                                                        <b>19.06.2012</b></font>: Transformation of CI and Elowitz were done by second group.
-
<p>
+
                                                                                                                                                                                                        <p>
-
<p><p><font face="tahoma" size="3" color="maroon">
+
                                                                                                                                                                                                        <p><p><font face="tahoma" size="3" color="maroon">
-
<b>27.06.2012</b></font>:Our last group did the transformation of LacI ,LasR and J23116. They also did LB agar with ampicillin according to LB agar protocol.
+
                                                                                                                                                                                                        <b>20.06.2012</b></font>: KS and RBS were done ,too.
-
<p>
+
                                                                                                                                                                                                        <p>
-
<p><p><font face="tahoma" size="3" color="maroon">
+
                                                                                                                                                                                                        <p><p><font face="tahoma" size="3" color="maroon">
-
<b>28.06.2012</b></font>: The primers arrived and we dilute them according to their special value 1:10 ratio. We tested our primers with PCR.
+
                                                                                                                                                                                                        <b>21.06.2012</b></font>: Plates were cleaned and the contaminated LB was poured.
-
<p>
+
                                                                                                                                                                                                        <p>
-
<p><p><font face="tahoma" size="3" color="maroon">
+
                                                                                                                                                                                                        <p><p><font face="tahoma" size="3" color="maroon">
-
<b>29.06.2012</b></font>: Meeting
+
                                                                                                                                                                                                        <b>22.06.2012</b></font>: Meeting Time
-
o Wetlab:
+
                                                                                                                                                                                                        o Were these protocols true , why didnӴ they work, who are we :S
-
Protocols were being collected for next procedures.
+
                                                                                                                                                                                                        All transformations, except Berke`s , were failed. So we started to change our protocols and repeated all procedures with these new protocols. After that time, transformations started to work.
-
o Software:
+
                                                                                                                                                                                                        o Funding team;
-
Software team started to build the model of kill switch and quorum sensing. They needed some parameters for these models .So lots of homework was given to all team to do some research about them.
+
                                                                                                                                                                                                        They all started to telephone calls to companies. They found some companies who are ready to help us . And they arranged meetings  with G�� Vakfi , Vendeka and GךDELERRIN SIRKETI. Also they collect the information for application of TUBITAK.
-
o Funding:
+
                                                                                                                                                                                                        <p>
-
Our rectorship started to give some funding for our wet lab procedures. Then they started to search funding for our plane tickets and accommodation.
+
-
<p>
+
-
<p><p><font face="tahoma" size="3" color="maroon">
+
                                                                                                                                                                                                        <p><p><font face="tahoma" size="3" color="maroon">
-
<b>30.06.2012</b></font>: We did the colony PCR from plates which we cultivate. The iGEM team of Baskent University came to our university for meeting .We decided for collaboration.  
+
                                                                                                                                                                                                        <b>23.06.2012</b></font>: With new protocols  transformations were started to repeat.
-
<p>
+
                                                                                                                                                                                                        <p>
-
&nbsp;
+
-
&nbsp;
+
-
<p><font face="tahoma" size="6" color="maroon">
+
-
<b>July,2012</b></font><p>
+
-
&nbsp;
+
-
<p><p><font face="tahoma" size="3" color="maroon">
+
                                                                                                                                                                                                        <p><p><font face="tahoma" size="3" color="maroon">
-
<b>02.07.2012</b></font>: Colony PCR didn’t work for the first times.
+
                                                                                                                                                                                                        <b>24.06.2012</b></font>: With our new protocol , the transformation of PLasR and JD were succeed.
-
<p>
+
                                                                                                                                                                                                        <p>
-
<p><p><font face="tahoma" size="3" color="maroon">
+
-
<b>03.07.2012</b></font>: Colony PCR still didn’t work.
+
-
<p>
+
-
<p><p><font face="tahoma" size="3" color="maroon">
+
                                                                                                                                                                                                        <p><p><font face="tahoma" size="3" color="maroon">
-
<b>04.07.2012</b></font>: By changing some conditions we tried colony pcr several times ,to find the error.
+
                                                                                                                                                                                                        <b>25.06.2012</b></font>: The parts,CI and Elowitz, were also done .
-
<p>
+
                                                                                                                                                                                                        <p>
-
<p><p><font face="tahoma" size="3" color="maroon">
+
-
<b>07.07.2012</b></font>:After some tries ,colony PCR was succeed and run samples on agorose gel according to its protocol. According to results, we put ONC into the shaker.
+
-
<p>
+
-
<p><p><font face="tahoma" size="3" color="maroon">
+
-
<b>08.07.2012</b></font>: However, we realized that our gel electrophoresis has some problems.  we couldn’t get any results. So we conclude that our ladder didn’t work.
+
-
<p>
+
-
<p><p><font face="tahoma" size="3" color="maroon">
+
-
<b>09.07.2012</b></font>:  We tried to find new ladder from our colleagues.
+
-
<p>
+
-
<p><p><font face="tahoma" size="3" color="maroon">
+
-
<b>10.07.2012</b></font>:  We control our ONC’s and we did plasmid isolation according to this protocol. After plasmid isolation we took nanodrop values of our plasmids.
+
-
<p>
+
-
<p><p><font face="tahoma" size="3" color="maroon">
+
-
<b>11.07.2012</b></font>: We ran the plasmids which we isolated in agorose gel electrophoresis. We prepared LB Broth, LB Agar and plates.
+
-
<p>
+
-
<p><p><font face="tahoma" size="3" color="maroon">
+
                                                                                                                                                                                                        <p><p><font face="tahoma" size="3" color="maroon">
-
<b>12.07.2012</b></font>: We prepared antibiotics ampicillin and kanamycin according to protocol1 and protocol2.
+
                                                                                                                                                                                                        <b>26.06.2012</b></font>: 26.06.2012: Our third group also succeeded the transformation of KS and RBS parts.
-
<p>
+
                                                                                                                                                                                                        <p>
-
<p><p><font face="tahoma" size="3" color="maroon">
+
-
<b>13.07.2012</b></font>: We cleaned up our lab.
+
-
<p>
+
-
<p><p><font face="tahoma" size="3" color="maroon">
+
-
<b>14.07.2012</b></font>:  Meeting
+
-
o Wetlab:
+
-
Protocols were being collected for next procedures.
+
-
o Software:
+
-
Software team started to build the model of kill switch and quorum sensing. They needed some parameters for these models .So lots of homework was given to all team to do some research about them.
+
-
o Funding:
+
-
Our rectorship started to give some funding for our wet lab procedures. Then they started to search funding for our plane tickets and accommodation.
+
-
<p>
+
-
<p><p><font face="tahoma" size="3" color="maroon">
+
                                                                                                                                                                                                        <p><p><font face="tahoma" size="3" color="maroon">
-
<b>15.07.2012</b></font>: 15.07.2012: LB Broth ,LB agar and plates were prepared .
+
                                                                                                                                                                                                        <b>27.06.2012</b></font>:Our last group did the transformation of LacI ,LasR and J23116. They also did LB agar with ampicillin according to LB agar protocol.
-
<p>
+
                                                                                                                                                                                                        <p>
-
<p><p><font face="tahoma" size="3" color="maroon">
+
-
<b>16.07.2012</b></font>: Funding team went to Interlab for sponsorship discussion.
+
-
<p>
+
-
<p><p><font face="tahoma" size="3" color="maroon">
+
                                                                                                                                                                                                        <p><p><font face="tahoma" size="3" color="maroon">
-
<b>17.07.2012</b></font>:  We did double digestion of our plasmids according to its protocol.  Then put the samples in Agorose Gel Electrophoresis and we did gel extraction according to its protocol.
+
                                                                                                                                                                                                        <b>28.06.2012</b></font>:  The primers arrived and we dilute them according to their special value 1:10 ratio. We tested our primers with PCR.
-
<p>
+
                                                                                                                                                                                                        <p>
-
<p><p><font face="tahoma" size="3" color="maroon">
+
                                                                                                                                                                                                        <p><p><font face="tahoma" size="3" color="maroon">
-
<b>18.07.2012</b></font>: 18.07.2012: Competent cells were done again.
+
                                                                                                                                                                                                        <b>29.06.2012</b></font>: Meeting
-
<p>
+
                                                                                                                                                                                                        o Wetlab:
-
<p><p><font face="tahoma" size="3" color="maroon">
+
                                                                                                                                                                                                        Protocols were being collected for next procedures.
-
<b>19.07.2012</b></font>:  We had a picnic with Baskent iGEM team .We all had great time.
+
                                                                                                                                                                                                        o Software:
-
<p>
+
                                                                                                                                                                                                        Software team started to build the model of kill switch and quorum sensing. They needed some parameters for these models .So lots of homework was given to all team to do some research about them.
 +
                                                                                                                                                                                                        o Funding:
 +
                                                                                                                                                                                                        Our rectorship started to give some funding for our wet lab procedures. Then they started to search funding for our plane tickets and accommodation.
 +
                                                                                                                                                                                                        <p>
-
<p><p><font face="tahoma" size="3" color="maroon">
+
                                                                                                                                                                                                        <p><p><font face="tahoma" size="3" color="maroon">
-
<b>20.07.2012</b></font>: We had a mini meeting for logo ideas. And we decided some details , so it was ready to professionally drawn.
+
                                                                                                                                                                                                        <b>30.06.2012</b></font>: We did the colony PCR from plates which we cultivate. The iGEM team of Baskent University came to our university for meeting .We decided for collaboration.  
-
<p>
+
                                                                                                                                                                                                        <p>
 +
                                                                                                                                                                                                        &nbsp;
 +
                                                                                                                                                                                                        &nbsp;
 +
                                                                                                                                                                                                        <p><font face="tahoma" size="6" color="maroon">
 +
                                                                                                                                                                                                        <b>July,2012</b></font><p>
 +
                                                                                                                                                                                                        &nbsp;
-
<p><p><font face="tahoma" size="3" color="maroon">
+
                                                                                                                                                                                                        <p><p><font face="tahoma" size="3" color="maroon">
-
<b>21.07.2012</b></font>: Meeting
+
                                                                                                                                                                                                        <b>02.07.2012</b></font>: Colony PCR didnӴ work for the first times.
-
o Preparation for iGEM party...
+
                                                                                                                                                                                                        <p>
-
With the wet lab works, we also carried out our human practice works. And we found a place for our party. And we designed our party tickets and party posters.(resimler) .We started to deliver our party flyers.
+
                                                                                                                                                                                                        <p><p><font face="tahoma" size="3" color="maroon">
-
o Software: After collecting homework, software team did some parts of models and parameters. They also started to talk about logo design.
+
                                                                                                                                                                                                        <b>03.07.2012</b></font>: Colony PCR still didnӴ work.
 +
                                                                                                                                                                                                        <p>
-
o Human Practice: They started to talk about the activities which were going to do in METU.   
+
                                                                                                                                                                                                        <p><p><font face="tahoma" size="3" color="maroon">
-
<p>
+
                                                                                                                                                                                                        <b>04.07.2012</b></font>: By changing some conditions we tried colony pcr several times ,to find the error.
 +
                                                                                                                                                                                                        <p>
 +
                                                                                                                                                                                                        <p><p><font face="tahoma" size="3" color="maroon">
 +
                                                                                                                                                                                                        <b>07.07.2012</b></font>:After some tries ,colony PCR was succeed and run samples on agorose gel according to its protocol. According to results, we put ONC into the shaker.
 +
                                                                                                                                                                                                        <p>
 +
                                                                                                                                                                                                        <p><p><font face="tahoma" size="3" color="maroon">
 +
                                                                                                                                                                                                        <b>08.07.2012</b></font>: However, we realized that our gel electrophoresis has some problemswe couldnӴ get any results. So we conclude that our ladder didnӴ work.
 +
                                                                                                                                                                                                        <p>
 +
                                                                                                                                                                                                        <p><p><font face="tahoma" size="3" color="maroon">
 +
                                                                                                                                                                                                        <b>09.07.2012</b></font>:  We tried to find new ladder from our colleagues.
 +
                                                                                                                                                                                                        <p>
 +
                                                                                                                                                                                                        <p><p><font face="tahoma" size="3" color="maroon">
 +
                                                                                                                                                                                                        <b>10.07.2012</b></font>:  We control our ONCӳ and we did plasmid isolation according to this protocol. After plasmid isolation we took nanodrop values of our plasmids.
 +
                                                                                                                                                                                                        <p>
 +
                                                                                                                                                                                                        <p><p><font face="tahoma" size="3" color="maroon">
 +
                                                                                                                                                                                                        <b>11.07.2012</b></font>: We ran the plasmids which we isolated in agorose gel electrophoresis. We prepared LB Broth, LB Agar and plates.
 +
                                                                                                                                                                                                        <p>
-
<p><p><font face="tahoma" size="3" color="maroon">
+
                                                                                                                                                                                                        <p><p><font face="tahoma" size="3" color="maroon">
-
<b>22.07.2012</b></font>:We did ligation to our samples.
+
                                                                                                                                                                                                        <b>12.07.2012</b></font>: We prepared antibiotics ampicillin and kanamycin according to protocol1 and protocol2.
-
<p>
+
                                                                                                                                                                                                        <p>
-
<p><p><font face="tahoma" size="3" color="maroon">
+
                                                                                                                                                                                                        <p><p><font face="tahoma" size="3" color="maroon">
-
<b>23.07.2012</b></font>: We controlled our samples with Agorose Gel electrophoresis. We did transformation from our ligated parts and spread them onto agar plate and we did ONC.
+
                                                                                                                                                                                                        <b>13.07.2012</b></font>: We cleaned up our lab.
-
<p>
+
                                                                                                                                                                                                        <p>
-
<p><p><font face="tahoma" size="3" color="maroon">
+
                                                                                                                                                                                                        <p><p><font face="tahoma" size="3" color="maroon">
-
<b>24.07.2012</b></font>:Preparation for party is done and last controls were done.
+
                                                                                                                                                                                                        <b>14.07.2012</b></font>: Meeting
-
<p>
+
                                                                                                                                                                                                        o Wetlab:
-
<p><p><font face="tahoma" size="3" color="maroon">
+
                                                                                                                                                                                                        Protocols were being collected for next procedures.
-
<b>25.07.2012</b></font>: Lab cleaning was done.
+
                                                                                                                                                                                                        o Software:  
-
<p>
+
                                                                                                                                                                                                        Software team started to build the model of kill switch and quorum sensing. They needed some parameters for these models .So lots of homework was given to all team to do some research about them.
-
27.07.2012:  
+
                                                                                                                                                                                                        o Funding:
-
<p><p><font face="tahoma" size="3" color="maroon">
+
                                                                                                                                                                                                        Our rectorship started to give some funding for our wet lab procedures. Then they started to search funding for our plane tickets and accommodation.
-
<b>28.07.2012</b></font>: Party Timee?
+
                                                                                                                                                                                                        <p>
-
At that night, we had our party with 300 visitors. We had lots of surprises, which introduces iGEM, for our guests. We wore our lab coats and had great fun through all night. Up to early in the morning, the music wasn’t closed. We left a great impression in our visitors’ mind about iGEM competition.  
+
-
<p>
+
-
&nbsp;
+
-
&nbsp;
+
-
<p><font face="tahoma" size="6" color="maroon">
+
-
<b>August,2012</b></font><p>
+
-
&nbsp;
+
-
<p><p><font face="tahoma" size="3" color="maroon">
+
-
<b>02.08.2012</b></font>: We did plasmid isolation optimization in 4 test isolation condition according to its protocol.
+
-
<p>
+
-
<p><p><font face="tahoma" size="3" color="maroon">
+
                                                                                                                                                                                                        <p><p><font face="tahoma" size="3" color="maroon">
-
<b>03.08.2012</b></font>: Meeting:
+
                                                                                                                                                                                                        <b>15.07.2012</b></font>: 15.07.2012: LB Broth ,LB agar and plates were prepared .
-
o Software:
+
                                                                                                                                                                                                        <p>
-
o Funding:
+
                                                                                                                                                                                                        <p><p><font face="tahoma" size="3" color="maroon">
-
<p>
+
                                                                                                                                                                                                        <b>16.07.2012</b></font>: Funding team went to Interlab for sponsorship discussion.
 +
                                                                                                                                                                                                        <p>
-
<p><p><font face="tahoma" size="3" color="maroon">
+
                                                                                                                                                                                                        <p><p><font face="tahoma" size="3" color="maroon">
-
<b>04.08.2012</b></font>: We did agorose gel electrophoresis and measure the nanodrop of the parts.
+
                                                                                                                                                                                                        <b>17.07.2012</b></font>: We did double digestion of our plasmids according to its protocol.  Then put the samples in Agorose Gel Electrophoresis and we did gel extraction according to its protocol.
-
<p>
+
                                                                                                                                                                                                        <p>
-
<p><p><font face="tahoma" size="3" color="maroon">
+
                                                                                                                                                                                                        <p><p><font face="tahoma" size="3" color="maroon">
-
<b>05.08.2012</b></font>: We did ONC from samples.
+
                                                                                                                                                                                                        <b>18.07.2012</b></font>: 18.07.2012: Competent cells were done again.
-
<p>
+
                                                                                                                                                                                                        <p>
 +
                                                                                                                                                                                                        <p><p><font face="tahoma" size="3" color="maroon">
 +
                                                                                                                                                                                                        <b>19.07.2012</b></font>:  We had a picnic with Baskent iGEM team .We all had great time.
 +
                                                                                                                                                                                                        <p>
-
<p><p><font face="tahoma" size="3" color="maroon">
+
                                                                                                                                                                                                        <p><p><font face="tahoma" size="3" color="maroon">
-
<b>06.08.2012</b></font>: We did plasmid isolation and measure their nanodrop , and put samples into agorose gel electrophoresis.
+
                                                                                                                                                                                                        <b>20.07.2012</b></font>: We had a mini meeting for logo ideas. And we decided some details , so it was ready to professionally drawn.
-
<p>
+
                                                                                                                                                                                                        <p>
-
<p><p><font face="tahoma" size="3" color="maroon">
+
-
<b>07.08.2012</b></font>: We did double digestion .
+
-
<p>
+
-
<p><p><font face="tahoma" size="3" color="maroon">
+
                                                                                                                                                                                                        <p><p><font face="tahoma" size="3" color="maroon">
-
<b>08.08.2012</b></font>: We controlled our parts , however ; we saw digestion hadn’t worked.
+
                                                                                                                                                                                                        <b>21.07.2012</b></font>: Meeting
-
<p>
+
                                                                                                                                                                                                        o Preparation for iGEM party...
-
<p><p><font face="tahoma" size="3" color="maroon">
+
                                                                                                                                                                                                        With the wet lab works, we also carried out our human practice works. And we found a place for our party. And we designed our party tickets and party posters.(resimler) .We started to deliver our party flyers.
-
<b>09.08.2012</b></font>: We repeated our digestion procedure according to its protocol.
+
                                                                                                                                                                                                        o Software: After collecting homework, software team did some parts of models and parameters. They also started to talk about logo design.
-
<p>
+
-
<p><p><font face="tahoma" size="3" color="maroon">
+
                                                                                                                                                                                                        o Human Practice: They started to talk about the activities which were going to do in METU.   
-
<b>10.08.2012</b></font>: Our final logo was drawn and we loved it.
+
                                                                                                                                                                                                        <p>
-
<p>
+
-
<p><p><font face="tahoma" size="3" color="maroon">
+
-
<b>11.08.2012</b></font>: We did ligation and gel electrophoresis.
+
-
<p>
+
-
<p><p><font face="tahoma" size="3" color="maroon">
+
-
<b>12.08.2012</b></font>: We did transformation of ligated parts, and realized some of the ligations were not successfully done.
+
-
<p>
+
-
<p><p><font face="tahoma" size="3" color="maroon">
+
-
<b>13.08.2012</b></font>: The unsuccessful ligations were repeated.
+
-
<p>
+
-
<p><p><font face="tahoma" size="3" color="maroon">
+
-
<b>14.08.2012</b></font>:The last ligations were also be controlled by transformation.
+
-
<p>
+
-
<p><p><font face="tahoma" size="3" color="maroon">
+
-
<b>15.08.2012</b></font>:  We prepared competent cell with CaCl2 treatment.
+
-
<p>
+
-
<p><p><font face="tahoma" size="3" color="maroon">
+
                                                                                                                                                                                                        <p><p><font face="tahoma" size="3" color="maroon">
-
<b>16.08.2012</b></font>: Meeting
+
                                                                                                                                                                                                        <b>22.07.2012</b></font>:We did ligation to our samples.
-
o Wetlab: We tried to collect all the equipment that we used to write them down to sponsorship list.
+
                                                                                                                                                                                                        <p>
-
o Software: Models were nearly completed and wiki codes were also nearly completed.
+
                                                                                                                                                                                                        <p><p><font face="tahoma" size="3" color="maroon">
-
o Funding: Our funding team said us that our plane tickets were bought ?
+
                                                                                                                                                                                                        <b>23.07.2012</b></font>: We controlled our samples with Agorose Gel electrophoresis. We did transformation from our ligated parts and spread them onto agar plate and we did ONC.
-
<p>
+
                                                                                                                                                                                                        <p>
 +
                                                                                                                                                                                                        <p><p><font face="tahoma" size="3" color="maroon">
 +
                                                                                                                                                                                                        <b>24.07.2012</b></font>:Preparation for party is done and last controls were done.
 +
                                                                                                                                                                                                        <p>
 +
                                                                                                                                                                                                        <p><p><font face="tahoma" size="3" color="maroon">
 +
                                                                                                                                                                                                        <b>25.07.2012</b></font>: Lab cleaning was done.
 +
                                                                                                                                                                                                        <p>
 +
                                                                                                                                                                                                        27.07.2012:
 +
                                                                                                                                                                                                        <p><p><font face="tahoma" size="3" color="maroon">
 +
                                                                                                                                                                                                        <b>28.07.2012</b></font>: Party Timee?
 +
                                                                                                                                                                                                        At that night, we had our party with 300 visitors. We had lots of surprises, which introduces iGEM, for our guests. We wore our lab coats and had great fun through all night. Up to early in the morning, the music wasnӴ closed. We left a great impression in our visitorsҠmind about iGEM competition.
 +
                                                                                                                                                                                                        <p>
 +
                                                                                                                                                                                                        &nbsp;
 +
                                                                                                                                                                                                        &nbsp;
 +
                                                                                                                                                                                                        <p><font face="tahoma" size="6" color="maroon">
 +
                                                                                                                                                                                                        <b>August,2012</b></font><p>
 +
                                                                                                                                                                                                        &nbsp;
 +
                                                                                                                                                                                                        <p><p><font face="tahoma" size="3" color="maroon">
 +
                                                                                                                                                                                                        <b>02.08.2012</b></font>: We did plasmid isolation optimization in 4 test isolation condition according to its protocol.
 +
                                                                                                                                                                                                        <p>
-
<p><p><font face="tahoma" size="3" color="maroon">
+
                                                                                                                                                                                                        <p><p><font face="tahoma" size="3" color="maroon">
-
<b>17.08.2012</b></font>: We did plasmid isolation for the parts; pLacI, KS, SD, J23116,pLasR and measure their nanodrop. We did competent cells and digestion.
+
                                                                                                                                                                                                        <b>03.08.2012</b></font>: Meeting:
-
<p>
+
                                                                                                                                                                                                        o Software:  
-
18.08.2012: We did transformations of RBS,CI,LVA and minC parts.
+
                                                                                                                                                                                                        o Funding:
-
19.08.2012: We did gel electrophoresis and we saw the DT-1 and pLacI. 
+
                                                                                                                                                                                                        <p>
-
21.08.2012: We did gel extraction.
+
-
22.08.2012: Meeting
+
-
o Software:
+
-
o Funding:
+
-
o Wetlab:
+
-
23.08.2012: We did competent cells.
+
-
24.08.2012: We talked about our wiki page and its design. We added some new parts to our wiki draft.
+
-
25.08.2012: We were searching for
+
-
26.08.2012: We started to collect the articles in our dropbox for references.
+
-
27.08.2012:
+
-
</div>
+
                                                                                                                                                                                                        <p><p><font face="tahoma" size="3" color="maroon">
 +
                                                                                                                                                                                                        <b>04.08.2012</b></font>: We did agorose gel electrophoresis and measure the nanodrop of the parts.
 +
                                                                                                                                                                                                        <p>
 +
                                                                                                                                                                                                        <p><p><font face="tahoma" size="3" color="maroon">
 +
                                                                                                                                                                                                        <b>05.08.2012</b></font>: We did ONC from samples.
 +
                                                                                                                                                                                                        <p>
 +
                                                                                                                                                                                                        <p><p><font face="tahoma" size="3" color="maroon">
 +
                                                                                                                                                                                                        <b>06.08.2012</b></font>: We did plasmid isolation and measure their nanodrop , and put samples into agorose gel electrophoresis.
 +
                                                                                                                                                                                                        <p>
 +
                                                                                                                                                                                                        <p><p><font face="tahoma" size="3" color="maroon">
 +
                                                                                                                                                                                                        <b>07.08.2012</b></font>: We did double digestion .
 +
                                                                                                                                                                                                        <p>
-
<!-- End Team -->
+
                                                                                                                                                                                                        <p><p><font face="tahoma" size="3" color="maroon">
-
<div class="cl">&nbsp;</div>
+
                                                                                                                                                                                                        <b>08.08.2012</b></font>:  We controlled our parts , however ; we saw digestion hadnӴ worked.
-
+
                                                                                                                                                                                                        <p>
-
+
                                                                                                                                                                                                        <p><p><font face="tahoma" size="3" color="maroon">
-
</div>
+
                                                                                                                                                                                                        <b>09.08.2012</b></font>: We repeated our digestion procedure according to its protocol.
-
</div>
+
                                                                                                                                                                                                        <p>
 +
                                                                                                                                                                                                        <p><p><font face="tahoma" size="3" color="maroon">
 +
                                                                                                                                                                                                        <b>10.08.2012</b></font>: Our final logo was drawn and we loved it.
 +
                                                                                                                                                                                                        <p>
 +
                                                                                                                                                                                                        <p><p><font face="tahoma" size="3" color="maroon">
 +
                                                                                                                                                                                                        <b>11.08.2012</b></font>: We did ligation and gel electrophoresis.
 +
                                                                                                                                                                                                        <p>
 +
                                                                                                                                                                                                        <p><p><font face="tahoma" size="3" color="maroon">
 +
                                                                                                                                                                                                        <b>12.08.2012</b></font>: We did transformation of ligated parts, and realized some of the ligations were not successfully done.
 +
                                                                                                                                                                                                        <p>
 +
                                                                                                                                                                                                        <p><p><font face="tahoma" size="3" color="maroon">
 +
                                                                                                                                                                                                        <b>13.08.2012</b></font>:  The unsuccessful ligations were repeated.
 +
                                                                                                                                                                                                        <p>
 +
                                                                                                                                                                                                        <p><p><font face="tahoma" size="3" color="maroon">
 +
                                                                                                                                                                                                        <b>14.08.2012</b></font>:The last ligations were also be controlled by transformation.
 +
                                                                                                                                                                                                        <p>
 +
                                                                                                                                                                                                        <p><p><font face="tahoma" size="3" color="maroon">
 +
                                                                                                                                                                                                        <b>15.08.2012</b></font>:  We prepared competent cell with CaCl2 treatment.
 +
                                                                                                                                                                                                        <p>
-
<!-- End Main -->
+
                                                                                                                                                                                                        <p><p><font face="tahoma" size="3" color="maroon">
-
<!-- Footer -->
+
                                                                                                                                                                                                        <b>16.08.2012</b></font>:  Meeting
-
<div id="footer">
+
                                                                                                                                                                                                        o Wetlab: We tried to collect all the equipment that we used to write them down to sponsorship list.
-
<div class="shell">
+
                                                                                                                                                                                                        o Software: Models were nearly completed and wiki codes were also nearly completed.
-
<p class="left">Copyright &copy; 2010 RightDirection. All rights reserved. Designed by <a href="http://chocotemplates.com" target="_blank" title="The Sweetest CSS Templates WorldWide">Chocotemplates.com</a></p>
+
                                                                                                                                                                                                        o Funding: Our funding team said us that our plane tickets were bought ?
-
<p class="right">
+
                                                                                                                                                                                                        <p>
-
<a href="#">Home</a>
+
 
-
<span>|</span>
+
                                                                                                                                                                                                        <p><p><font face="tahoma" size="3" color="maroon">
-
    <a href="#">About</a>
+
                                                                                                                                                                                                        <b>17.08.2012</b></font>: We did plasmid isolation for the parts; pLacI, KS, SD, J23116,pLasR and measure their nanodrop. We did competent cells and digestion.
-
    <span>|</span>
+
                                                                                                                                                                                                        <p>
-
    <a href="#">Team</a>
+
                                                                                                                                                                                                        18.08.2012: We did transformations of RBS,CI,LVA and minC parts.
-
    <span>|</span>
+
                                                                                                                                                                                                        19.08.2012: We did gel electrophoresis and we saw the DT-1 and pLacI. 
-
    <a href="#">Jobs</a>
+
                                                                                                                                                                                                        21.08.2012: We did gel extraction.
-
    <span>|</span>
+
                                                                                                                                                                                                        22.08.2012: Meeting
-
    <a href="#">Contact Us</a>
+
                                                                                                                                                                                                        o Software: 
-
    <span>|</span>
+
                                                                                                                                                                                                        o Funding:
-
    <a href="#">Portfolio</a>
+
                                                                                                                                                                                                        o Wetlab:
-
    <span>|</span>
+
                                                                                                                                                                                                        23.08.2012: We did competent cells.
-
    <a href="#">Blog</a>
+
                                                                                                                                                                                                        24.08.2012: We talked about our wiki page and its design. We added some new parts to our wiki draft.
-
    </p>
+
                                                                                                                                                                                                        25.08.2012: We were searching for
-
    <div class="cl">&nbsp;</div>
+
                                                                                                                                                                                                        26.08.2012: We started to collect the articles in our dropbox for references.
-
</div>
+
                                                                                                                                                                                                        27.08.2012:
-
</div>
+
 
-
<!-- Footer -->
+
                                                                                                                                                                                                        </div>
-
</body>
+
 
-
</html>
+
 
 +
                                                                                                                                                                                                        <!-- End Team -->
 +
                                                                                                                                                                                                        <div class="cl">&nbsp;</div>
 +
 
 +
 
 +
                                                                                                                                                                                                        </div>
 +
                                                                                                                                                                                                        </div>
 +
 
 +
 
 +
                                                                                                                                                                                                        <!-- End Main -->
 +
                                                                                                                                                                                                        <!-- Footer -->
 +
                                                                                                                                                                                                        <div id="footer">
 +
                                                                                                                                                                                                        <div class="shell">
 +
                                                                                                                                                                                                        <p class="left">Copyright &copy; 2010 RightDirection. All rights reserved. Designed by <a href="http://chocotemplates.com" target="_blank" title="The Sweetest CSS Templates WorldWide">Chocotemplates.com</a></p>
 +
                                                                                                                                                                                                        <p class="right">
 +
                                                                                                                                                                                                        <a href="#">Home</a>
 +
                                                                                                                                                                                                        <span>|</span>
 +
                                                                                                                                                                                                        <a href="#">About</a>
 +
                                                                                                                                                                                                        <span>|</span>
 +
                                                                                                                                                                                                        <a href="#">Team</a>
 +
                                                                                                                                                                                                        <span>|</span>
 +
                                                                                                                                                                                                        <a href="#">Jobs</a>
 +
                                                                                                                                                                                                        <span>|</span>
 +
                                                                                                                                                                                                        <a href="#">Contact Us</a>
 +
                                                                                                                                                                                                        <span>|</span>
 +
                                                                                                                                                                                                        <a href="#">Portfolio</a>
 +
                                                                                                                                                                                                        <span>|</span>
 +
                                                                                                                                                                                                        <a href="#">Blog</a>
 +
                                                                                                                                                                                                        </p>
 +
                                                                                                                                                                                                        <div class="cl">&nbsp;</div>
 +
                                                                                                                                                                                                        </div>
 +
                                                                                                                                                                                                        </div>
 +
                                                                                                                                                                                                        <!-- Footer -->
 +
                                                                                                                                                                                                        </body>
 +
                                                                                                                                                                                                        </html>

Revision as of 08:30, 23 September 2012

Timeline

 

December,2011

 

11.12.2011 :First Meeting Today the all that responded our announcements to be a part of the iGEM competition representing the METU-IGEM team got together for the first time. In total we have got 50 interested students, 2 instructors and 1 adviser. We started by introducing ourselves then we talked about our past IGEM experiences. Here, with the audiences we decided to make a brainstorming session which should be after reading enough about more on synthetic biology. Furthermore, we decided to make a brainstorming session to decide on our project after 1 week.

18.12.2011: Brainstorming Session Part 1: To make a successful plan we know that the first think should be done is coming together and adding the ideas each other. In the first part of the brainstorming we simply think everything and write them on the board! (add the photo 1)

25.12.2011: Brainstorming Session Part 2: In the second part of the brainstorming we continue to storm the ideas and writing down to the board. Then we made a schedule to think the ideas for their feasibility and if it is possible making circuits of the plans. (add the photo 2)

   

January,2012

 

03.01.2012: Eliminating the Ideas: The imagination of our team was extremely high because ,our team consists mainly first and second year students. At the end of the brainstorming sessions, there were lots of crazy ideas; however, we had to eliminate them. Finally we ended up with two main project. By trying to choose our main project, the several managerial tasks were divided among the team members. By doing so everyone got the chance to use their experience while learning from each other. Then we divided our team as a 4 different sub-groups;

   

February,2012

 

13.02.2012: Article Reading In the middle of the semester holiday, we did a meeting to give some homework to team members. We decided to prepare an article pool about our two main projects. By collecting information, we could have decided which one was more possible or which parts we had to add or remove from our projects.

27.02.2012: Deciding to main project ӠCO FILTERԍ After semester holiday, we had read and summarized so many articles. With this huge amount of information we prepared lots of presentations to transfer the information and to discuss about them. After reading and discussing the so many articles related to our two main topics, we chose CO filter as our main project.

   

March,2012

 

06.03.2012: To build the system of our project Because our team members were inexperienced ,we had mini classes in which the basis of genetic engineering is taught. After this time, we all were excellent article readers. We tried to access all possible information about our project and try to build up the system, by finding available promoters ,genes,etc. We finally built the system and we presented it to our advisors.

13.03.2012: Searching for sponsorship Just after deciding our project, we started to search for sponsorship for our team. We started to make telephone calls to every single company or government unit about our project. In this time , we started to search for a new lab.

20.03.2012: Building our own iGEM laboratory Our instructor ,Mrs. Akkaya had already offered her lab for our experiments. However, this wasnӴ enough for us. So after this search, we found a new lab in the basement of Chemistry Building. This lab was being used as storage for this building and was full of unnecessary stuff. By the time, we collected the last parts of our system and we all started to clean our new lab.(temizlik resimleri)

   

April,2012

 

04.04.2012: software meetings Our software team started to do their own meetings. At first , they gather information about the model of our project. At the same time, they started to discussions about the design of our wiki page. By this time, they design a draft logo which is: (eski logo resmi)

11.04.2012: human practice meetings At this time, human practice sub team started to collect their ideas and present them to all group members. They made lots of presentation about their projects. Moreover, they implemented almost all of their ideas; making a short movie, organizing a iGEM party and a picnic with the other iGEM team of Turkey:Baskent University team,going to funfair to tell people about iGEM,etc.

18.04.2012: Hardworking software team Software team was arranging lots of meetings to talk about the design of our wiki page and the logo. After so many crazy ideas we ended with our current logo :Ɓfter deciding our logo, software team started to ask the ideas of all team about wiki design.

25.04.2012: : Meetings with presidency of METU Our funding team arranged meetings with rector of our university. After those meetings, we found some money necessary for our wet lab practices.

   

May,2012

 

02.05.2012:Readdyyy for wet lab!! After cleaning, we designed our laboratory .Because our lab was a radioactive working place, we had to remove lots of stuff and check whole lab for radioactive substances. Because of our limited budget ,we can only place an old PCR machine named as UMUT. Then we had opened the box sent by iGEM with big excitement for the first time.

09.05.2012: letӳ go into autoclave together!! We all introduced with autoclave at this times. All equipment that we had collected was autoclaved patiently and this procedure has been done often up to now.

23.05.2012: Preparing plates.. As a beginning of our wet lab work, we prepared lots of plates with agar medium. It was necessary to prepare them continuously during our working period. The first preparation was so excited for every one of us; however after time passing, this part has become the most boring part of study.

   

June,2012

 

06.06.2012: Lab cleaning List We all had started to live and work in this lab, so we have to keep it clean. We made a cleaning list and paste it on to our door. And we arrange a post stage for our lab notes. (resimler) And as a compulsory work, we had to have a lab notebook to write down all procedures.

13.06.2012:Now Transformation List From iGEM kit we started to extract our parts and after diluting store them in fridges. Addition to this, we prepared competent cell series. Because we are very crowded wet lab team , we had to divide people into sub groups for transformation.

14.06.2012: Protocols, have you seen my protocols? The senior members of our team started to search for their reliable protocols. We collected all protocols that we could find. Then we copied all to our lab notebooks?

15.06.2012: Competent cells were prepared according to our protocol. A new list was done to do competent cell.

16.06.2012:Let the transformations begin! All the members of our team started to learn how to do transformation. All parts, removed and diluted, were ready to do transformation. There were almost ten groups for doing transformation. All started to their work one by one.

18.06.2012:We did the transformation of PLasR and JD.

19.06.2012: Transformation of CI and Elowitz were done by second group.

20.06.2012: KS and RBS were done ,too.

21.06.2012: Plates were cleaned and the contaminated LB was poured.

22.06.2012: Meeting Time o Were these protocols true , why didnӴ they work, who are we :S All transformations, except Berke`s , were failed. So we started to change our protocols and repeated all procedures with these new protocols. After that time, transformations started to work. o Funding team; They all started to telephone calls to companies. They found some companies who are ready to help us . And they arranged meetings with G�� Vakfi , Vendeka and GךDELERRIN SIRKETI. Also they collect the information for application of TUBITAK.

23.06.2012: With new protocols transformations were started to repeat.

24.06.2012: With our new protocol , the transformation of PLasR and JD were succeed.

25.06.2012: The parts,CI and Elowitz, were also done .

26.06.2012: 26.06.2012: Our third group also succeeded the transformation of KS and RBS parts.

27.06.2012:Our last group did the transformation of LacI ,LasR and J23116. They also did LB agar with ampicillin according to LB agar protocol.

28.06.2012: The primers arrived and we dilute them according to their special value 1:10 ratio. We tested our primers with PCR.

29.06.2012: Meeting o Wetlab: Protocols were being collected for next procedures. o Software: Software team started to build the model of kill switch and quorum sensing. They needed some parameters for these models .So lots of homework was given to all team to do some research about them. o Funding: Our rectorship started to give some funding for our wet lab procedures. Then they started to search funding for our plane tickets and accommodation.

30.06.2012: We did the colony PCR from plates which we cultivate. The iGEM team of Baskent University came to our university for meeting .We decided for collaboration.

   

July,2012

 

02.07.2012: Colony PCR didnӴ work for the first times.

03.07.2012: Colony PCR still didnӴ work.

04.07.2012: By changing some conditions we tried colony pcr several times ,to find the error.

07.07.2012:After some tries ,colony PCR was succeed and run samples on agorose gel according to its protocol. According to results, we put ONC into the shaker.

08.07.2012: However, we realized that our gel electrophoresis has some problems. we couldnӴ get any results. So we conclude that our ladder didnӴ work.

09.07.2012: We tried to find new ladder from our colleagues.

10.07.2012: We control our ONCӳ and we did plasmid isolation according to this protocol. After plasmid isolation we took nanodrop values of our plasmids.

11.07.2012: We ran the plasmids which we isolated in agorose gel electrophoresis. We prepared LB Broth, LB Agar and plates.

12.07.2012: We prepared antibiotics ampicillin and kanamycin according to protocol1 and protocol2.

13.07.2012: We cleaned up our lab.

14.07.2012: Meeting o Wetlab: Protocols were being collected for next procedures. o Software: Software team started to build the model of kill switch and quorum sensing. They needed some parameters for these models .So lots of homework was given to all team to do some research about them. o Funding: Our rectorship started to give some funding for our wet lab procedures. Then they started to search funding for our plane tickets and accommodation.

15.07.2012: 15.07.2012: LB Broth ,LB agar and plates were prepared .

16.07.2012: Funding team went to Interlab for sponsorship discussion.

17.07.2012: We did double digestion of our plasmids according to its protocol. Then put the samples in Agorose Gel Electrophoresis and we did gel extraction according to its protocol.

18.07.2012: 18.07.2012: Competent cells were done again.

19.07.2012: We had a picnic with Baskent iGEM team .We all had great time.

20.07.2012: We had a mini meeting for logo ideas. And we decided some details , so it was ready to professionally drawn.

21.07.2012: Meeting o Preparation for iGEM party... With the wet lab works, we also carried out our human practice works. And we found a place for our party. And we designed our party tickets and party posters.(resimler) .We started to deliver our party flyers. o Software: After collecting homework, software team did some parts of models and parameters. They also started to talk about logo design. o Human Practice: They started to talk about the activities which were going to do in METU.

22.07.2012:We did ligation to our samples.

23.07.2012: We controlled our samples with Agorose Gel electrophoresis. We did transformation from our ligated parts and spread them onto agar plate and we did ONC.

24.07.2012:Preparation for party is done and last controls were done.

25.07.2012: Lab cleaning was done.

27.07.2012:

28.07.2012: Party Timee? At that night, we had our party with 300 visitors. We had lots of surprises, which introduces iGEM, for our guests. We wore our lab coats and had great fun through all night. Up to early in the morning, the music wasnӴ closed. We left a great impression in our visitorsҠmind about iGEM competition.

   

August,2012

 

02.08.2012: We did plasmid isolation optimization in 4 test isolation condition according to its protocol.

03.08.2012: Meeting: o Software: o Funding:

04.08.2012: We did agorose gel electrophoresis and measure the nanodrop of the parts.

05.08.2012: We did ONC from samples.

06.08.2012: We did plasmid isolation and measure their nanodrop , and put samples into agorose gel electrophoresis.

07.08.2012: We did double digestion .

08.08.2012: We controlled our parts , however ; we saw digestion hadnӴ worked.

09.08.2012: We repeated our digestion procedure according to its protocol.

10.08.2012: Our final logo was drawn and we loved it.

11.08.2012: We did ligation and gel electrophoresis.

12.08.2012: We did transformation of ligated parts, and realized some of the ligations were not successfully done.

13.08.2012: The unsuccessful ligations were repeated.

14.08.2012:The last ligations were also be controlled by transformation.

15.08.2012: We prepared competent cell with CaCl2 treatment.

16.08.2012: Meeting o Wetlab: We tried to collect all the equipment that we used to write them down to sponsorship list. o Software: Models were nearly completed and wiki codes were also nearly completed. o Funding: Our funding team said us that our plane tickets were bought ?

17.08.2012: We did plasmid isolation for the parts; pLacI, KS, SD, J23116,pLasR and measure their nanodrop. We did competent cells and digestion.

18.08.2012: We did transformations of RBS,CI,LVA and minC parts. 19.08.2012: We did gel electrophoresis and we saw the DT-1 and pLacI. 21.08.2012: We did gel extraction. 22.08.2012: Meeting o Software: o Funding: o Wetlab: 23.08.2012: We did competent cells. 24.08.2012: We talked about our wiki page and its design. We added some new parts to our wiki draft. 25.08.2012: We were searching for 26.08.2012: We started to collect the articles in our dropbox for references. 27.08.2012: