Team:UC Chile/Cyano/Labook/may

From 2012.igem.org

(Difference between revisions)
 
(2 intermediate revisions not shown)
Line 31: Line 31:
<div id="navbar3">
<div id="navbar3">
<ul>Lab book:<br>  
<ul>Lab book:<br>  
-
<li><a href="https://2012.igem.org/Team:UC_Chile/Labook/march">March</a></li><li><a href="https://2012.igem.org/Team:UC_Chile/Cyano/Labook/april">April</a></li><li><a href="https://2012.igem.org/Team:UC_Chile/Cyano/Labook/may">May</a></li><li><a href="https://2012.igem.org/Team:UC_Chile/Cyano/Labook/june">June</a></li><li><a href="https://2012.igem.org/Team:UC_Chile/Cyano/Labook/july">July</a></li><li><a href="https://2012.igem.org/Team:UC_Chile/Cyano/Labook/august">August</a></li><li><a href="https://2012.igem.org/Team:UC_Chile/Cyano/Labook/september">September</a></li>
+
<li><a href="https://2012.igem.org/Team:UC_Chile/Labook/march">March</a></li><li><a href="https://2012.igem.org/Team:UC_Chile/Cyano/Labook/april">April</a></li><li><a href="https://2012.igem.org/Team:UC_Chile/Cyano/Labook/may">May</a></li><li><a href="https://2012.igem.org/Team:UC_Chile/Cyano/Labook/june">June</a></li><li><a href="https://2012.igem.org/Team:UC_Chile/Cyano/Labook/july">July</a></li><li><a href="https://2012.igem.org/Team:UC_Chile/Cyano/Labook/august">August</a></li><li><a href="https://2012.igem.org/Team:UC_Chile/Cyano/Labook/september">September</a></li><li><a href="https://2012.igem.org/Team:UC_Chile/Cyano/Labook/october">October</a></li>
</ul>
</ul>
</div>
</div>
Line 40: Line 40:
<p><font size= "5">May</font></p>
<p><font size= "5">May</font></p>
-
 
-
[[File:maylabook.jpg|center]]
 
<font size="4">Monthly Summary</font>
<font size="4">Monthly Summary</font>
Line 47: Line 45:
<br>
<br>
As Gibson assemblies are not working properly, constructs are being prepared in parallel by Standard Biobrick Assembly. After many attempts we concluded that the enzymes in the master mix are defective and new ones were ordered. There will be no Gibson attempts until arrival.
As Gibson assemblies are not working properly, constructs are being prepared in parallel by Standard Biobrick Assembly. After many attempts we concluded that the enzymes in the master mix are defective and new ones were ordered. There will be no Gibson attempts until arrival.
 +
<font size="4">Digestion and Ligation attempts</font>
<font size="4">Digestion and Ligation attempts</font>
 +
pPMQAK1 (expression plasmid) was miniprepped and transformed.
pPMQAK1 (expression plasmid) was miniprepped and transformed.
Line 69: Line 69:
                                                                
                                                                
Standard biobrick assembly was attempted (x2 times). There were no colonies in transformation.   
Standard biobrick assembly was attempted (x2 times). There were no colonies in transformation.   
 +
<font size="4">Gibson Assembly Attempts</font>
<font size="4">Gibson Assembly Attempts</font>

Latest revision as of 19:15, 26 October 2012

Project: Luxilla - Pontificia Universidad Católica de Chile, iGEM 2012