Team:Cornell/project/drylab/status
From 2012.igem.org
(Difference between revisions)
Line 47: | Line 47: | ||
<div class="row last-ele"> | <div class="row last-ele"> | ||
<div class="six columns"> | <div class="six columns"> | ||
+ | <br/> | ||
From the beginnings of SAFEBET, Cornell iGEM set out to design and build a fully functional prototype. We have done just that. | From the beginnings of SAFEBET, Cornell iGEM set out to design and build a fully functional prototype. We have done just that. | ||
<br /> | <br /> | ||
<br /> | <br /> | ||
Over the course of 5 months we have run through a full design cycle. | Over the course of 5 months we have run through a full design cycle. | ||
- | + | ||
</div> | </div> | ||
<div class="six columns"> | <div class="six columns"> |
Latest revision as of 20:25, 12 November 2012
-
Dry Lab
- How It Works
- Functional Requirements
- Components
- Modeling
- Device Status
Device Status
From the beginnings of SAFEBET, Cornell iGEM set out to design and build a fully functional prototype. We have done just that.
Over the course of 5 months we have run through a full design cycle.
Established strong set of functional requirements. | |
Developed design to fulfill functional requirements. | |
Fabricated device in house. | |
Tested and analyzed device for operation. |