Tuesday 04.17
+
We purified parts for Construct 1 and then assembled them by Gibson. Hope everythings works out. Simon was wearing his Gibson Les Paul T-shirt so we kinda hope that the power of rock leads us through the good side of the force.
We purified parts for Construct 1 and then assembled them by Gibson. Hope everythings works out. Simon was wearing his Gibson Les Paul T-shirt so we kinda hope that the power of rock leads us through the good side of the force.
Line 68: Line 65:
-
Thursday 04.19
+
<b>Thursday<b>
Construct 1 is ready!!!
Construct 1 is ready!!!
Line 78: Line 75:
-
Friday 04.20
+
<b>Friday</b>
Line 87: Line 84:
-
Sat 04.21
+
<b>Sat</b>
Started preparing parts for Construct 2 by PCR.