Team:Cornell/project/drylab/status
From 2012.igem.org
(Difference between revisions)
JamesMathew (Talk | contribs) |
JamesMathew (Talk | contribs) |
||
Line 89: | Line 89: | ||
</div> | </div> | ||
<div class="row last-ele"> | <div class="row last-ele"> | ||
- | <div class=" | + | <div class="seven columns"> |
<iframe frameborder="0" src="https://dl.dropbox.com/u/3824307/iGEM/youtube.html" style="width:100%;height:95%;"></iframe> | <iframe frameborder="0" src="https://dl.dropbox.com/u/3824307/iGEM/youtube.html" style="width:100%;height:95%;"></iframe> | ||
</div> | </div> |
Revision as of 03:31, 27 October 2012
-
Dry Lab
- How It Works
- Functional Requirements
- Components
- Modeling
- Device Status
Device Status
From the beginnings of SAFEBET, Cornell iGEM set out to design and build a fully functional prototype. We have done just that.
Over the course of 5 months we have run through a full design cycle.
Over the course of 5 months we have run through a full design cycle.
Established strong set of functional requirements. | |
Developed design to fulfill functional requirements. | |
Fabricated device in house. | |
Tested and analyzed device for operation. |