Team:SYSU-Software/Notebook
From 2012.igem.org
Nie1234567 (Talk | contribs) |
Nie1234567 (Talk | contribs) |
||
(6 intermediate revisions not shown) | |||
Line 1: | Line 1: | ||
{{:Team:SYSU-Software/menu}} | {{:Team:SYSU-Software/menu}} | ||
- | <html xmlns="http://www.w3.org/1999/xhtml"> | + | <html xmlns="http://www.w3.org/1999/xhtml" xmlns:m="http://schemas.microsoft.com/office/2004/12/omml" xmlns:v="urn:schemas-microsoft-com:vml" xmlns:o="urn:schemas-microsoft-com:office:office"> |
<head> | <head> | ||
Line 20: | Line 20: | ||
<div id="header" class="clear" style="background-color: #545454"> | <div id="header" class="clear" style="background-color: #545454"> | ||
<div class="wrapper"> | <div class="wrapper"> | ||
- | <a href="/" class="sysu-title"></a> | + | <a href="https://2012.igem.org/Team:SYSU-Software" class="sysu-title"></a> |
<!--end navigation--> | <!--end navigation--> | ||
Line 31: | Line 31: | ||
<div id="menu"> | <div id="menu"> | ||
<ul id="nav"> | <ul id="nav"> | ||
- | <li class="mainlevel" id="mainlevel_01"><a href=" | + | <li class="mainlevel" id="mainlevel_01"><a href="https://2012.igem.org/Team:SYSU-Software"> Home</a> |
</li> | </li> | ||
- | <li class="mainlevel" id="mainlevel_02"><a href=" | + | <li class="mainlevel" id="mainlevel_02"><a href="https://2012.igem.org/Team:SYSU-Software/Project">Project</a> |
</li> | </li> | ||
- | + | ||
- | <li class="mainlevel"><a href=" | + | <li class="mainlevel"><a href="https://2012.igem.org/Team:SYSU-Software/Models">Models</a> |
+ | </li> | ||
+ | <li class="mainlevel"><a href="https://2012.igem.org/Team:SYSU-Software/Tutorial">Tutorial</a> | ||
+ | |||
+ | </li> | ||
+ | <li class="mainlevel"><a href="https://2012.igem.org/Team:SYSU-Software/Team">Team</a> | ||
</li> | </li> | ||
- | + | ||
- | |||
- | |||
- | |||
- | |||
- | <li class="mainlevel"><a href=" | + | <li class="mainlevel"><a href="https://2012.igem.org/Team:SYSU-Software/Notebook">Notebook</a></li> |
+ | <li class="mainlevel"><a href="https://2012.igem.org/Team:SYSU-Software/Practice"> | ||
+ | Tips</a><!--input an em tag as a space,IE is gread need--> | ||
+ | </li> | ||
+ | <li class="mainlevel"><a href="https://2012.igem.org/Team:SYSU-Software/WorldJamboree"> | ||
+ | World-Jamboree</a><!--input an em tag as a space,IE is gread need--> | ||
+ | |||
+ | </li> | ||
+ | |||
</ul> | </ul> | ||
Line 67: | Line 76: | ||
<div> | <div> | ||
<p> Brain Storm & Design Plan 1.0.</p> | <p> Brain Storm & Design Plan 1.0.</p> | ||
- | + | </div> | |
<h2 id="r1"><strong>20th – 31th March 2012</strong></h2> | <h2 id="r1"><strong>20th – 31th March 2012</strong></h2> | ||
<div> | <div> | ||
<p> Final Project Plan enacted. </p> | <p> Final Project Plan enacted. </p> | ||
- | + | </div> | |
<h2 id="r2"><strong>13rd April 2012</strong></h2> | <h2 id="r2"><strong>13rd April 2012</strong></h2> | ||
<div> | <div> | ||
- | <p> The | + | <p> The first seminar was held for the whole team, introducing the project to team members.</p> |
</div> | </div> | ||
<h2 id="r3">14th – 20th April 2012</h2> | <h2 id="r3">14th – 20th April 2012</h2> | ||
Line 89: | Line 98: | ||
<p> Studying for Final Exams…..</p> | <p> Studying for Final Exams…..</p> | ||
</div> | </div> | ||
- | <h2 id="r6"> | + | <h2 id="r6">16th July 2012</h2> |
<div> | <div> | ||
- | <p> | + | <p> Achieve basic function of Genome Browser.</p> |
+ | <h2 id="r8">23th July 2012</h2> | ||
+ | <p> Improve graphic display in Ribowswitch | ||
+ | Designer</p> | ||
+ | <p> Improve connection between lines in Network | ||
+ | Illustrator</p> | ||
+ | <h2 id="r10">30th July 2012</h2> | ||
+ | <p> Genome Browser: sequence and graphic display | ||
+ | <span>synchronistically</span> </p> | ||
+ | <p> Riboswitch: Input box ;graphic display vectorially</p> | ||
+ | <div style="MARGIN: 4px 0px"> | ||
+ | FBA: complete sbml DATA debugging</div> | ||
+ | <h2 id="r11">13th August 2012</h2> | ||
+ | <p> Genome Browser:locate gene when input gene name</p> | ||
+ | <p> Designer:finish SiRNA;merge the code of Ribowswitch | ||
+ | and SiRNA;</p> | ||
+ | <p> FBA: finish PhPP and FVA Solve;</p> | ||
+ | <p> DataBase: collect riboswitch data; collect the | ||
+ | integral genome of G-Circle; TF;</p> | ||
+ | <h2 id="r12">16th September 2012</h2> | ||
+ | <p> Improve each part of the software. </p> | ||
+ | <h2 id="r13">24th September 2012 —</h2> | ||
+ | <p> Pack the software;</p> | ||
+ | <p> Finish wiki and tutorial. </p> | ||
+ | <div> | ||
+ | Upload our project to github:<br> | ||
+ | | ||
+ | <a href="https://github.com/sysu-software/BiArkit"> | ||
+ | https://github.com/sysu-software/BiArkit</a><br> | ||
+ | </div> | ||
+ | <p> | ||
+ | </p> | ||
</div> | </div> | ||
Line 105: | Line 145: | ||
<ul> | <ul> | ||
<li> | <li> | ||
- | <a href="/ | + | <a href="https://2012.igem.org/Team:SYSU-Software">Main Page</a> |
</li> | </li> | ||
<li> | <li> | ||
- | <a href="/ | + | <a href="https://2012.igem.org/Team:SYSU-Software/Team">Album</a> |
</li> | </li> | ||
<li> | <li> | ||
- | <a href="/ | + | <a href="https://2012.igem.org/Team:SYSU-Software/SecondEdition">Second Edition</a> |
+ | </li> | ||
+ | <li> | ||
+ | <a href="https://2012.igem.org/Team:SYSU-Software/Accomplishment">Accomplishment</a> | ||
</li> | </li> | ||
Line 123: | Line 166: | ||
<ul> | <ul> | ||
<li> | <li> | ||
- | <a href="/ | + | <a href="https://2012.igem.org/Team:SYSU-Software/Download"> |
- | + | Download</a> | |
</li> | </li> | ||
<li> | <li> | ||
- | <a href="/ | + | <a href="https://2012.igem.org/Team:SYSU-Software/Tutorial">Tutorial</a> |
</li> | </li> | ||
<li> | <li> | ||
- | <a href="/ | + | <a href="https://2012.igem.org/Team:SYSU-Software/Video">Video</a> |
- | + | ||
- | + | ||
- | + | ||
</li> | </li> | ||
+ | |||
<li> | <li> | ||
- | <a href="/ | + | <a href="https://2012.igem.org/Team:SYSU-Software/Contact">Email</a> |
</li> | </li> | ||
Line 149: | Line 190: | ||
<ul> | <ul> | ||
<li> | <li> | ||
- | <a href="">Questions</a> | + | <a href="https://2012.igem.org/Team:SYSU-Software/Faq">Questions</a> |
</li> | </li> | ||
<li> | <li> | ||
- | <a href="">Troubleshooting</a> | + | <a href="https://2012.igem.org/Team:SYSU-Software/Trouble">Troubleshooting</a> |
</li> | </li> | ||
<li> | <li> | ||
- | <a href=" | + | <a href="https://2012.igem.org/Team:SYSU-Software/Uninstalling">Uninstalling</a> |
- | + | ||
- | + | ||
- | + | ||
- | + | ||
- | + | ||
- | + | ||
- | + | ||
- | + | ||
- | + | ||
- | + | ||
- | + | ||
- | + | ||
- | + | ||
- | + | ||
</li> | </li> | ||
<li> | <li> | ||
- | <a href="/ | + | <a href="https://2012.igem.org/Team:SYSU-Software/Contact">Contact Us</a> |
</li> | </li> | ||
</ul> | </ul> | ||
Line 215: | Line 242: | ||
<div class="wrapper clear"> | <div class="wrapper clear"> | ||
<div id="footer-about" class="footer-column"> | <div id="footer-about" class="footer-column"> | ||
- | <h2>About</h2> | + | <h2> About</h2> |
<ul> | <ul> | ||
<li> | <li> | ||
- | <a href="/ | + | <a href="https://2012.igem.org/Team:SYSU-Software/Team">Developers</a> |
</li> | </li> | ||
<li> | <li> | ||
- | <a href="/ | + | <a href="https://2012.igem.org/Team:SYSU-Software/Contact">Contact Us</a> |
</li> | </li> | ||
</ul> | </ul> | ||
</div> | </div> | ||
<div id="footer-flickr" class="footer-column"> | <div id="footer-flickr" class="footer-column"> | ||
- | <h2>Links</h2> | + | <h2> Links</h2> |
<ul> | <ul> | ||
<li><a href="http://www.sysu.edu.cn">SUN YAT-SEN University</a></li> | <li><a href="http://www.sysu.edu.cn">SUN YAT-SEN University</a></li> | ||
- | <li><a href="http://lifescience.sysu.edu.cn/main/default/index.aspx">SYSU | + | <li><a href="http://lifescience.sysu.edu.cn/main/default/index.aspx">SYSU LifeScience</a></li> |
</ul> | </ul> | ||
- | + | ||
</div> | </div> | ||
<div id="footer-search" class="footer-column"> | <div id="footer-search" class="footer-column"> | ||
- | <h2>Facebook</h2> | + | <h2> Facebook</h2> |
</div> | </div> |
Latest revision as of 02:48, 20 October 2012
Our Notebook
1st – 18th March 2012
Brain Storm & Design Plan 1.0.
20th – 31th March 2012
Final Project Plan enacted.
13rd April 2012
The first seminar was held for the whole team, introducing the project to team members.
14th – 20th April 2012
The requirement analysis of the software was done. The assignments to everyone was confirmed.
May 2012
Knowledge and Experience was accumulated and the genome browser was established. Seminars were held once a week.
June 2012
Studying for Final Exams…..
16th July 2012
Achieve basic function of Genome Browser.
23th July 2012
Improve graphic display in Ribowswitch Designer
Improve connection between lines in Network Illustrator
30th July 2012
Genome Browser: sequence and graphic display synchronistically
Riboswitch: Input box ;graphic display vectorially
13th August 2012
Genome Browser:locate gene when input gene name
Designer:finish SiRNA;merge the code of Ribowswitch and SiRNA;
FBA: finish PhPP and FVA Solve;
DataBase: collect riboswitch data; collect the integral genome of G-Circle; TF;
16th September 2012
Improve each part of the software.
24th September 2012 —
Pack the software;
Finish wiki and tutorial.