Team:SYSU-Software/Notebook
From 2012.igem.org
Nie1234567 (Talk | contribs) |
Nie1234567 (Talk | contribs) |
||
Line 114: | Line 114: | ||
<p> DataBase: collect riboswitch data; collect the | <p> DataBase: collect riboswitch data; collect the | ||
integral genome of Circos; TF;</p> | integral genome of Circos; TF;</p> | ||
- | <h2 id="r12">16th | + | <h2 id="r12">16th September 2012</h2> |
<p> Improve each part of the tool kit. </p> | <p> Improve each part of the tool kit. </p> | ||
- | <h2 id="r13">24th | + | <h2 id="r13">24th September 2012 —</h2> |
<p> Pack the software;</p> | <p> Pack the software;</p> | ||
<p> Finish wiki and tutorial. | <p> Finish wiki and tutorial. |
Revision as of 12:32, 26 September 2012
Our Notebook
1st – 18th March 2012
Brain Storm & Design Plan 1.0.
20th – 31th March 2012
Final Project Plan enacted.
13rd April 2012
The fist seminar was held for the whole team, introducing the project to team members.
14th – 20th April 2012
The requirement analysis of the software was done. The assignments to everyone was confirmed.
May 2012
Knowledge and Experience was accumulated and the genome browser was established. Seminars were held once a week.
June 2012
Studying for Final Exams…..
16th July 2012
Achieve basic function of Genome Browser.
23th July 2012
Improve graphic display in Ribowswitch Designer
Improve connection between lines in Network Illustrator
30th July 2012
Genome Browser: sequence and graphic display synchronistically
Riboswitch: Input box ;graphic display vectorially
13th August 2012
Genome Browser:locate gene when input gene name
Designer:finish SiRNA;merge the code of Ribowswitch and SiRNA;
FBA: finish PhPP and FVA Solve;
DataBase: collect riboswitch data; collect the integral genome of Circos; TF;
16th September 2012
Improve each part of the tool kit.
24th September 2012 —
Pack the software;
Finish wiki and tutorial.