Meetings with Dr. Gutiérrez every two weeks to check work done.                             
Meetings with Dr. Gutiérrez every two weeks to check work done.                             
-
Monthly Summary:
+
<font size="4">Monthly Summary:</font>
We started with the design of constructs to express RFP under circadian promoters (psbAB and psBA2) and their respective primers. The amplification of the parts needed for the constructs are obtained by PCR. There have been several problems related to the amplification of Kanr. The PCR has been repeated with high frequency with no significant results.
We started with the design of constructs to express RFP under circadian promoters (psbAB and psBA2) and their respective primers. The amplification of the parts needed for the constructs are obtained by PCR. There have been several problems related to the amplification of Kanr. The PCR has been repeated with high frequency with no significant results.

Revision as of 21:05, 23 September 2012

Project: Luxilla - Pontificia Universidad Católica de Chile, iGEM 2012