Line 179: Line 179:
Xiaodan Xu:Made a list of the protection base for the restriction sites.
Xiaodan Xu:Made a list of the protection base for the restriction sites.
 +
 +
<html>
 +
<div class="clear"></div>
 +
</div>
 +
 +
 +
<div class="content" id="m5content">
 +
<h3>May</h3><br>
 +
</html>
 +
 +
2012-5-2 Wed
 +
 +
Xintong Ling: modified the model of biosensor.
 +
 +
 +
 +
2012-5-3 Thur
 +
 +
Xiaodan Xu:Chose the target fragment of FtsZ.
 +
 +
 +
 +
2012-5-7 Mon
 +
 +
Muyuan Chen & Xiaodan Xu: Modified the experiment program--the promoter and the hairpin of the antisense fragment.
 +
 +
 +
 +
2012-5-8 Tue
 +
 +
Ying Cheng: Made the summary of the previous project.
 +
 +
Kai Gui: Finished the model of cellular automata based on the AHL signal diffusion.
 +
 +
 +
 +
2012-5-10 Thur
 +
 +
Our group discussed about the human practice.
 +
 +
Xingyu Zhou:Modified the experiment program of AHL part.
 +
 +
Xintong Ling: Summarise the previous model.
 +
 +
Xiaodan Xu: sorted out the kits list.
 +
 +
 +
 +
2012-5-11 Fri
 +
 +
Xintong Ling:modified the model of cellular automata.
 +
 +
 +
 +
2012-5-12 Sat
 +
 +
Xingyu Zhou:finished the complete AHL experiment program.
 +
 +
 +
 +
2012-5-13 Sun
 +
 +
Xiaodan Xu: Made a list of possibly useful kits.
 +
 +
 +
2012-5-14 Mon
 +
 +
Muyuan Chen: Ordered the paired termini sequence.
 +
 +
 +
2012-5-16 Wed
 +
 +
Xintong Ling & Kai Gui & Jun Zhang: had a meeting talking about the model.
 +
 +
 +
 +
2012-5-22 Tue
 +
 +
Xingyu Zhou: Found out the chemical way of the AHL detection.
 +
 +
 +
 +
2012-5-24 Thur
 +
 +
Xiaodan Xu: transformed the K082034 to make sure the method of Kit usage is correct.
 +
 +
 +
 +
2012-5-27 Sun
 +
 +
Had a group meeting and summarise the work we had done.Made the schedule for the summer vacation and everyone started the preparation for their final examinations.
 +
 +
 +
 +
2012-5-31 Thur
 +
Xingyu Zhou: Finished the budget for our project.

Revision as of 07:54, 23 September 2012

header1
header2


Notebook






  • March
  • April
  • May

March


2012-3-18 Sun

After discussion in the seminar, 13 students organized the iGEM team and set out to design our project.


2012-3-24 Sat

Our project application were admitted in our school and the registry work started.

The achievements of one week's work:

Muyuan Chen & Xuelong Fan: responsible for the fund application and team registry work.

Xingyu Zhou: designed the bio-sensor based on the asymmetric colony.

Ying Cheng & Zhu Zhu: Searched the information about quorum sensing.

Xiaodan Xu: Read the literature on E.coli's flagella and division.

Peng Cheng & Le Zhou: designed the wiki and logo.


2012-3-25 Sun

Shen Gao: improved the method of cultivation of E.coli.


2012-3-26 Tue

Muyuan Chen: Did some research on light sensor. We voted and named our team SEU_Omega~


2012-3-27 Wed

Filled the application form on the www.igem.org.


2012-3-31 Sat

Xintong Ling: Finished the simulation of diffusion equation in the rectangular case.

April


2012-4-1 Sun

Xintong Ling: finished the diffusion model based on the random containers and made a plan for further models.


2012-4-5 Thur

Muyuan Chen: Made the schedule and experiment program before our summer vacation. Found some information about toggle switch.

Xuelong Fan: Did some research on the light sensor.

Xiaodan Xu: Learnt about how to use NCBI.


2012-4-7 Sat

Had a group meeting and discussed about the future plans.

Xiaodan Xu: Found out the antisense FtsZ gene can be used to control the shape of E.coli's colony.


2012-4-9 Mon

Shen Gao: Choose Pet-32a plasmid for our experiment.


2012-4-12 Thur

Xiaodan Xu: Found a way to verification the primers.


2012-4-13 Fri

Xintong Ling: Finished the simple cell division model.


2012-4-17 Tue

Shen Gao: Learnt about the primer design.

Xingyu Zhou: Designed the quorum sensing part——the AHL system.

Muyuan Chen: Use vectorNTI to analysis plasmid.



2012-4-19 Thur

Xintong Ling:finished the Cellular Automata based on the AHL density.

Xingyu Zhou:Made the expriment plan for the AHL system and found some related kits for his plan.


2012-4-20 Fri

Muyuan Chen: Made the experiment plan for the antisense FtsZ.

Xintong Ling:improved the model of cellular automata.


2012-4-22 Sun

Shen Gao:improved the method of gel extraction and agarose gel electrophoresis.

Xingyu Zhou:Made a summary of AHL sensing system.


2012-4-24 Tue

Xintong Ling & Kai Gui:made the schedule for the further modeling.

Kai Gui:finished the model of biosensor.


2012-4-26 Thur

Xiaodan Xu:Made the experiment plan for antisense FtsZ.


2012-4-29 Sun

Xiaodan Xu:Made a list of the protection base for the restriction sites.


May


2012-5-2 Wed

Xintong Ling: modified the model of biosensor.


2012-5-3 Thur

Xiaodan Xu:Chose the target fragment of FtsZ.


2012-5-7 Mon

Muyuan Chen & Xiaodan Xu: Modified the experiment program--the promoter and the hairpin of the antisense fragment.


2012-5-8 Tue

Ying Cheng: Made the summary of the previous project.

Kai Gui: Finished the model of cellular automata based on the AHL signal diffusion.


2012-5-10 Thur

Our group discussed about the human practice.

Xingyu Zhou:Modified the experiment program of AHL part.

Xintong Ling: Summarise the previous model.

Xiaodan Xu: sorted out the kits list.


2012-5-11 Fri

Xintong Ling:modified the model of cellular automata.


2012-5-12 Sat

Xingyu Zhou:finished the complete AHL experiment program.


2012-5-13 Sun

Xiaodan Xu: Made a list of possibly useful kits.


2012-5-14 Mon

Muyuan Chen: Ordered the paired termini sequence.


2012-5-16 Wed

Xintong Ling & Kai Gui & Jun Zhang: had a meeting talking about the model.


2012-5-22 Tue

Xingyu Zhou: Found out the chemical way of the AHL detection.


2012-5-24 Thur

Xiaodan Xu: transformed the K082034 to make sure the method of Kit usage is correct.


2012-5-27 Sun

Had a group meeting and summarise the work we had done.Made the schedule for the summer vacation and everyone started the preparation for their final examinations.


2012-5-31 Thur Xingyu Zhou: Finished the budget for our project.