Team:Copenhagen/Notebook
From 2012.igem.org
(Difference between revisions)
Line 8: | Line 8: | ||
<a name="June"></a><h2>June</h2> | <a name="June"></a><h2>June</h2> | ||
<br> | <br> | ||
- | <a name="Week 1a"></a><h2>Week 1: 4th-8th | + | <a name="Week 1a"></a><h2>Week 1: 4th-8th</h2> |
Exam period starts :( | Exam period starts :( | ||
Line 15: | Line 15: | ||
<br> | <br> | ||
<br> | <br> | ||
- | <a name="Week 2a"></a><h2>Week 2: 11th-15th | + | <a name="Week 2a"></a><h2>Week 2: 11th-15th</h2> |
Exams for a lot of our team members but we start designing our primers. | Exams for a lot of our team members but we start designing our primers. | ||
Line 22: | Line 22: | ||
<br> | <br> | ||
<br> | <br> | ||
- | <a name="Week 3a"></a><h2>Week 3: 18th-22nd | + | <a name="Week 3a"></a><h2>Week 3: 18th-22nd</h2> |
Primers are designed and ordered so we'll have them next week. | Primers are designed and ordered so we'll have them next week. | ||
Line 29: | Line 29: | ||
<br> | <br> | ||
<br> | <br> | ||
- | <a name="Week 3a"></a><h2>Week 4: 25th-29th | + | <a name="Week 3a"></a><h2>Week 4: 25th-29th</h2> |
Exams are finally over and we can start some of the lab work! Yay!!! :D | Exams are finally over and we can start some of the lab work! Yay!!! :D | ||
Line 41: | Line 41: | ||
<a name="July"></a><h2>July</h2> | <a name="July"></a><h2>July</h2> | ||
<br> | <br> | ||
- | <a name="Week 1b"></a><h2><h2>Week 1: 2nd-6th | + | <a name="Week 1b"></a><h2><h2>Week 1: 2nd-6th</h2> |
The sequencing results have come back, and everything was as we hoped. | The sequencing results have come back, and everything was as we hoped. | ||
Line 51: | Line 51: | ||
<br> | <br> | ||
<br> | <br> | ||
- | <a name="Week 2b"></a><h2>Week 2: 9th-13th | + | <a name="Week 2b"></a><h2>Week 2: 9th-13th</h2> |
We're still having trouble with both pSB1C3 and ProC. We're currently running a self-annealing programme for ProC because it is to small to do PCR. pSB1C3, on the other hand, seems too big so therefore we've lowered the annealing temperature and chosen a longer extension time. So far it has had no effect but we will keep optimizing. | We're still having trouble with both pSB1C3 and ProC. We're currently running a self-annealing programme for ProC because it is to small to do PCR. pSB1C3, on the other hand, seems too big so therefore we've lowered the annealing temperature and chosen a longer extension time. So far it has had no effect but we will keep optimizing. |
Revision as of 19:22, 9 July 2012