Team:Evry/Notebook/w13
From 2012.igem.org
(Difference between revisions)
PierreYves (Talk | contribs) |
PierreYves (Talk | contribs) |
||
Line 7: | Line 7: | ||
<h2>Monday 3rd</h2> | <h2>Monday 3rd</h2> | ||
- | + | <u><h5>Construction about a new pCS2+ with RFP insert</u></h5> | |
- | Construction about a new pCS2+ with RFP insert | + | |
-Digestion of the miniprep about pCSB1C3 with RFP insert by EcoRI and PstI | -Digestion of the miniprep about pCSB1C3 with RFP insert by EcoRI and PstI | ||
Line 19: | Line 18: | ||
<h2>Tuesday 3rd</h2> | <h2>Tuesday 3rd</h2> | ||
- | |||
- | + | <u><h5>Preparation of a new stock of electrocompetent cells T10</u></h5> | |
- | Construction about a new pCS2+ with RFP insert : | + | <u><h5>Construction about a new pCS2+ with RFP insert :</u></h5> |
- | + | <i>Following</i> | |
-Transformation by electroporation with T10 cells | -Transformation by electroporation with T10 cells |
Revision as of 16:26, 5 September 2012
Weeks:
June | July | August | September | October | November | ||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|