Team:SUSTC-Shenzhen-B/achievements

From 2012.igem.org

(Difference between revisions)
Line 467: Line 467:
<h1><p>Achievements</p></h1>
<h1><p>Achievements</p></h1>
                 <h3 class="STYLE13">1. Function of our Web Tool and PC Software</h3>
                 <h3 class="STYLE13">1. Function of our Web Tool and PC Software</h3>
-
<p>If the user input his terminator sequence, our program will output the secondary structure of the terminator based on Energy Minimization Rule and the termination efficiency. There is a database we make which includes many efficiency-measured terminators and some basic information of those terminators.</p>
+
<p>When a terminator sequence was entered, our software would output the secondary structure of the terminator based on Energy Minimization Rule and the termination efficiency.</p>
 +
<p>Besides, we made a database which includes many efficiency-measured terminators and some basic information of them.</p>
<img src="https://static.igem.org/mediawiki/2012/8/8a/%E6%97%A0%E6%A0%87%E9%A2%98.png" class="img_fl img_border" />
<img src="https://static.igem.org/mediawiki/2012/8/8a/%E6%97%A0%E6%A0%87%E9%A2%98.png" class="img_fl img_border" />
<h3 class="STYLE13">2. Calculation of Terminator Efficiency</h3>
<h3 class="STYLE13">2. Calculation of Terminator Efficiency</h3>
-
<p>We calculate the d score of terminators we got from Biofab.Terminator Library. Then we made a simulation formula of d score and termination efficiency based on the efficiency data in that terminator library and the score we calculated. We made linear fitting and the R^2 is 0.54. The picture below shows the results:</p><p>
+
<p>We calculate the D score of several terminators we got from Biofab. Terminator Library. Then we made a simulation formula of D score and termination efficiency based on the efficiency data in that terminator library and the score we calculated. We made a linear fitting and the R^2 is 0.54. The picture below shows the results:</p><p>
<img src="https://static.igem.org/mediawiki/2012/a/a1/%E6%97%A0%E6%A0%87%E9%A2%981.png" class="img_fl img_border" /></p>
<img src="https://static.igem.org/mediawiki/2012/a/a1/%E6%97%A0%E6%A0%87%E9%A2%981.png" class="img_fl img_border" /></p>
<br>
<br>
<p>(Figure 1:The x-axis is d score and the y-axis is termination  efficiency)</p>
<p>(Figure 1:The x-axis is d score and the y-axis is termination  efficiency)</p>
-
<p>Our lab group did experiments to measured efficiency of some terminators. We chose five of them to see if the prediction of TTEC(the software we created to predict terminator efficiency) works well. The picture below shows the results. The x-axis is the efficiency data of got from our experiments and the y-axis is the efficiency predicted by TTEC. We can see that the slope of linear fitting is closed to 1 and the R^2 is 0.621.</p>
+
<p>Our lab group did experiments to measure efficiency of some terminators. We chose five of them to see if the prediction of TTEC(the software we created to predict terminator efficiency) works well. The picture below shows the results. The x-axis is the efficiency data we got from our experiments and the y-axis is the efficiency predicted by TTEC. We can see that the slope of linear fitting is closed to 1 and the R^2 is 0.621.</p>
<p>
<p>
<img src="https://static.igem.org/mediawiki/2012/3/33/%E6%97%A0%E6%A0%87%E9%A2%982.png" class="img_fl img_border" /></p>
<img src="https://static.igem.org/mediawiki/2012/3/33/%E6%97%A0%E6%A0%87%E9%A2%982.png" class="img_fl img_border" /></p>
<p>(Figure 2)</p>
<p>(Figure 2)</p>
-
<p>We thought the results were good but we would continue to better our prediction in future.</p>
+
<p>We thought the results were good but we would continue to improve our prediction in future.</p>
<h3 class="STYLE13">3. Our Database</h3>
<h3 class="STYLE13">3. Our Database</h3>
-
<p>We built a database of terminators whose efficiency had been measured. Not only terminator efficiency , other information such as the direction, category and structure are also included. Some of the data were from partsregistry and Biofab.Terminator Library. Others were from papers. We read so many papers to find those terminators and some of the information were got through our e-mail with the author.The database will continue to update so it will be more useful for people. </p>
+
<p>We built a database of terminators whose efficiency had been measured. Not only terminator efficiency , other information such as the direction, category and structure are also included. Some of the data were from partsregistry and Biofab.Terminator Library. Others were from papers. We read many papers to find those terminators and some of the information were got through our e-mail with the author.The database will continue to update to give it more utility.</p>
<p><img src="https://static.igem.org/mediawiki/2012/0/0d/%E6%97%A0%E6%A0%87%E9%A2%9821.png" width="880" height="500"class="img_fl img_border" /></p>
<p><img src="https://static.igem.org/mediawiki/2012/0/0d/%E6%97%A0%E6%A0%87%E9%A2%9821.png" width="880" height="500"class="img_fl img_border" /></p>

Revision as of 16:45, 26 October 2012

Title

Achievements

1. Function of our Web Tool and PC Software

When a terminator sequence was entered, our software would output the secondary structure of the terminator based on Energy Minimization Rule and the termination efficiency.

Besides, we made a database which includes many efficiency-measured terminators and some basic information of them.

2. Calculation of Terminator Efficiency

We calculate the D score of several terminators we got from Biofab. Terminator Library. Then we made a simulation formula of D score and termination efficiency based on the efficiency data in that terminator library and the score we calculated. We made a linear fitting and the R^2 is 0.54. The picture below shows the results:


(Figure 1:The x-axis is d score and the y-axis is termination efficiency)

Our lab group did experiments to measure efficiency of some terminators. We chose five of them to see if the prediction of TTEC(the software we created to predict terminator efficiency) works well. The picture below shows the results. The x-axis is the efficiency data we got from our experiments and the y-axis is the efficiency predicted by TTEC. We can see that the slope of linear fitting is closed to 1 and the R^2 is 0.621.

(Figure 2)

We thought the results were good but we would continue to improve our prediction in future.

3. Our Database

We built a database of terminators whose efficiency had been measured. Not only terminator efficiency , other information such as the direction, category and structure are also included. Some of the data were from partsregistry and Biofab.Terminator Library. Others were from papers. We read many papers to find those terminators and some of the information were got through our e-mail with the author.The database will continue to update to give it more utility.


South University of Science and Technology of China