Team:TU Darmstadt/Documentation

From 2012.igem.org

(Difference between revisions)
(Overview)
Line 45: Line 45:
* the extensive [https://2012.igem.org/Team:TU_Darmstadt/Modeling modeling] section ranging from docking simulations to molecular dynamics
* the extensive [https://2012.igem.org/Team:TU_Darmstadt/Modeling modeling] section ranging from docking simulations to molecular dynamics
* the [https://2012.igem.org/Team:TU_Darmstadt/Safety safety] section, that gives an account of the safety meassures that were taken in our laboratories
* the [https://2012.igem.org/Team:TU_Darmstadt/Safety safety] section, that gives an account of the safety meassures that were taken in our laboratories
 +
* the [https://2012.igem.org/Team:TU_Darmstadt/Cooperation] section, that gives an short overview of the cooperation meassures that were taken too support the iGEM team Frankfurt
* a [https://2012.igem.org/Team:TU_Darmstadt/Downloads download] section, featuring the finalised procedures for the individual [https://2012.igem.org/Team:TU_Darmstadt/Project sub-projects]
* a [https://2012.igem.org/Team:TU_Darmstadt/Downloads download] section, featuring the finalised procedures for the individual [https://2012.igem.org/Team:TU_Darmstadt/Project sub-projects]

Revision as of 23:21, 26 September 2012

Overview

The following pages document all the information that were gained during our project this includes:
Documentation overview.png
  • the labjournals that feature all carried out tasks in chronological order
  • a collection of protocols that were used during our laboratory phase
  • the list of materials including detailed information on compounds and mixtures
  • the extensive modeling section ranging from docking simulations to molecular dynamics
  • the safety section, that gives an account of the safety meassures that were taken in our laboratories
  • the [1] section, that gives an short overview of the cooperation meassures that were taken too support the iGEM team Frankfurt
  • a download section, featuring the finalised procedures for the individual sub-projects