Team:BAU-Indonesia/Attributions

From 2012.igem.org

(Difference between revisions)
 
(7 intermediate revisions not shown)
Line 170: Line 170:
<div class="left_news_top"></div>
<div class="left_news_top"></div>
<div class="left_news_bg">
<div class="left_news_bg">
-
<h2><b>Sponsorship Team Journey</b></h2>
+
<h2><b>Attributions</b></h2>
-
<div class="text"><br>                                     
+
<br> <div class="text">
-
  <h4><strong>09-15 Mei 2012</strong></h4>
+
   
-
    <h4>• Making the team delegate proposal: to be given to the High Education Office (the proposal has not been signed by the vice chancellor of academic and student affairs).<br> </h4>
+
                                    <img style="border:double" src="https://static.igem.org/mediawiki/2012/e/e0/Attribution.png"/><br><br><br>
-
   
+
    <h4 style="text-align:justify">
-
  <h4><strong>20 Juni 2012</strong></h4>
+
                                      The project is carried out in stages starting from sampling crumbs plastic in landfills Galuga on the 2nd of June 2012, then isolated on agar media. Transferred from a liquid medium is expected there will be a single cell that contains genes kutinase using enrichment medium. Continued to perform the isolation of DNA from the sample by extraction with host lab is divided by the division of labor among:<br><br>
-
    <h4>• Sending proposals and cover letters  into High Education Office (the proposal has not been signed by the vice chancellor of academic and student affairs).<br> </h4>
+
                                   
-
                                       
+
1. Modelling Biobrick : Making construction of BioBrick design<br>
-
                                        <h4><strong>24 Juni 2012</strong></h4>
+
2. Isolasi    : Making growth media, perform the isolation of the samples will be given further treatment<br>
-
    <h4>• Making sponsorship proposal.<br> </h4>
+
3. Ligation and Transformation : Doing stage followed by ligation of the sample on the sample stage of transformation<br>
-
                                       
+
4. Notebook : Document any activities that have been done so visible track record of activity in the form of notes and drawings<br>
-
                                        <h4><strong>23 Agustus 2012</strong></h4>
+
5. Degradation Test  : Test results obtained are expected to contain genes that are qualitatively and quantitatively<br>
-
    <h4>• Sending proposal to BRI and BNI (Bank), The proposal has not been signed by the vice chancellor of academic and student affairs. <br> </h4>
+
6. Project Report and Literature: look at the literature related to the project that we are doing to see comparison and as reference material) and report the results of the project<br>
-
                                       
+
7. Project leader Wetlab :Directing the activities wetlab<br>
-
                                       
+
8. Advisors : Provide guidance related to what we have to carry out in particular in terms of the molecular laboratory work<br>
-
                                        <h4><strong>3 September 2012</strong></h4>
+
9. Instructors: Provide technical workmanship molecular laboratory activities every activity we will do<br>
-
    <h4>• Following up proposal to the High Education Office. We got advice from the High Education Office to complete the proposal with the signature of vice chancellor of academic and student affairs. Our proposal to the BRI Bank had been rejected.<br> </h4>
+
10. Technicians : Provide technical assistance in the laboratory work on all aspects of molecular construction and provision of laboratory materials<br>
-
                                       
+
11. Professional Website Designer : Website design director<br>
-
                                       
+
12. Artist    : perform work related to the project such as design mascot, poster<br>
-
                                        <h4><strong>6 September 2012</strong></h4>
+
13. Negotiator leader : a team representative in negotiating cooperation with external parties<br>
-
    <h4>• Following up to the bank (BRI & BNI), High Education Office. The proposal was still processed at BNI and BRI Bank. The proposal at High Education Office had been arrived at Public Division. <br> </h4>
+
14. Budgetting and accommodation: designing financial needs during the activity<br>
-
                                       
+
15.Fundrising team: team looking for fundraising<br>
-
                                       
+
16. Project report, authorship, acknowledgement of source and references:  Reported overall activity and gives an idea of ​​how different the research we do<br>
-
                                       
+
17. Biobrick modeling: assemble a system to perform bio synthetic
-
                                        <h4><strong>11 September 2012</strong></h4>
+
18. Poster: create a poster to illustrate the activities we have done with the results of the activity as a whole<br><br>
-
    <h4>• Making the new proposal and cover letters ( it has been signed by the Advisor, Dekan FMIPA The vice chancellor of academic and student affairs, Head of Department Biology)<br> </h4>
+
 
-
                                       
+
Special Thanks to:<br>
-
                                        <h4><strong>13 September 2012</strong></h4>
+
1. Dr.Ir. Ence Darmo Jaya Supena, MS<br>
-
    <h4>• Sending new proposal to the Bank (Mandiri & BNI), Indonesia State Gas Company,  The Ministry of Environment. The proposal has been completed by the cover letters from Bogor Agricultural University.<br> </h4>
+
2. Dr. Ir. Rimbawan<br>
-
                                       
+
3. Dr. Ir. Sri Nurdiati, M.Sc<br>
-
                                        <h4><strong>24 September 2012</strong></h4>
+
3. Dr. Ir. Agus Buono, M.Si M.Kom<br>
-
    <h4>• Follow up DIKTI, BNI, MANDIRI, PGN dan KLH : BNI  dan Mandiri : <br>
+
4. Prof.Dr.Ir. Antonius Suwanto<br>
-
• BNI and Mandiri Bank told us that Our proposal has been given to the Corporate Secretary. <br>
+
5. Dr. Ir. Sulistijorini, M.Si<br>
-
• Our proposal has been given to the chief of High Education Office. The decision will be sent to the vice chancellor of academic and student affairs, <br>
+
6. Dr. Dra. Anja Meryandini, MS<br>
-
• Our proposal has been rejected by the The Ministry of Environment. They don't have the budget for this kind of research.<br>
+
7. Dr. Dra. Nisa Rachmania, M.Si<br>
-
• Indonesia State Gas Company : Our proposal is still in process.  
+
8. Esa Ayu Pratama<br>
-
<br> </h4>
+
9. Bulan<br>
-
                                       
+
10. Liliani Isna Devi    <br>                                
-
                                       
+
11. Prof. Dr.Suminar Setiati Achmadi <br>
-
                                        <h4><strong>25 September 2012</strong></h4>
+
12. Miss Tetty Kemala<br>        
-
    <h4>• In the evening, we got news from Mandiri and BNI Bank that our proposal can't be accepted by the company.<br> </h4>
+
13. Dr. Iman Rusmana, M.si<br>                          
-
+
</h4><br>   
 +
 
 +
       
         
         
         
         
-
                  </div>
+
              </div>
<div class="clear"></div>
<div class="clear"></div>
</div>
</div>
Line 233: Line 235:
<div class="row-padding">
<div class="row-padding">
<div class="wrapper">
<div class="wrapper">
-
<div class="col-1">
+
-
<h2>Address:</h2>
+
<div class="col-3">
-
<dl class="address">
+
<h2><b>Follow Us: <b/></h2>
-
<dt>&nbsp;</dt>
+
-
</dl>
+
-
</div>
+
-
<div class="col-2">
+
-
<h2>Follow Us:</h2>
+
<ul class="list-services">
<ul class="list-services">
-
<li class="item-1"><a href="#">Facebook</a></li>
+
-
<li class="item-2"><a href="#">Twitter</a></li>
+
<li class="item-2"><a href="https://twitter.com/BAU_INDONESIA" target="_blank">Twitter (BAU-INDOESIA)</a></li>
-
<li class="item-3"><a href="#">LinkedIn</a></li>
+
</ul>
</ul>
</div>
</div>
-
<div class="col-3">
+
-
<h2>Why Us:</h2>
+
-
<ul class="list-1">
+
-
<li><a href="#">Lorem ipsum dolor</a></li>
+
-
<li><a href="#">Aonsect adipisic</a></li>
+
-
<li><a href="#">Eiusmjkod tempor</a></li>
+
-
<li><a href="#">Incididunt ut labore</a></li>
+
-
</ul>
+
-
</div>
+
-
<div class="col-4">
+
-
<div class="indent3"></div>
+
-
</div>
+
</div>
</div>
</div><div class="clear"></div>
</div><div class="clear"></div>
-
<div id="footer_bottom">
+
-
+
-
</div>
+
  </div>
  </div>
</div>
</div>

Latest revision as of 03:52, 27 September 2012


Metamorphosis Design Free Css Templates

Attributions





The project is carried out in stages starting from sampling crumbs plastic in landfills Galuga on the 2nd of June 2012, then isolated on agar media. Transferred from a liquid medium is expected there will be a single cell that contains genes kutinase using enrichment medium. Continued to perform the isolation of DNA from the sample by extraction with host lab is divided by the division of labor among:

1. Modelling Biobrick : Making construction of BioBrick design
2. Isolasi : Making growth media, perform the isolation of the samples will be given further treatment
3. Ligation and Transformation : Doing stage followed by ligation of the sample on the sample stage of transformation
4. Notebook : Document any activities that have been done so visible track record of activity in the form of notes and drawings
5. Degradation Test : Test results obtained are expected to contain genes that are qualitatively and quantitatively
6. Project Report and Literature: look at the literature related to the project that we are doing to see comparison and as reference material) and report the results of the project
7. Project leader Wetlab :Directing the activities wetlab
8. Advisors : Provide guidance related to what we have to carry out in particular in terms of the molecular laboratory work
9. Instructors: Provide technical workmanship molecular laboratory activities every activity we will do
10. Technicians : Provide technical assistance in the laboratory work on all aspects of molecular construction and provision of laboratory materials
11. Professional Website Designer : Website design director
12. Artist : perform work related to the project such as design mascot, poster
13. Negotiator leader : a team representative in negotiating cooperation with external parties
14. Budgetting and accommodation: designing financial needs during the activity
15.Fundrising team: team looking for fundraising
16. Project report, authorship, acknowledgement of source and references: Reported overall activity and gives an idea of ​​how different the research we do
17. Biobrick modeling: assemble a system to perform bio synthetic 18. Poster: create a poster to illustrate the activities we have done with the results of the activity as a whole

Special Thanks to:
1. Dr.Ir. Ence Darmo Jaya Supena, MS
2. Dr. Ir. Rimbawan
3. Dr. Ir. Sri Nurdiati, M.Sc
3. Dr. Ir. Agus Buono, M.Si M.Kom
4. Prof.Dr.Ir. Antonius Suwanto
5. Dr. Ir. Sulistijorini, M.Si
6. Dr. Dra. Anja Meryandini, MS
7. Dr. Dra. Nisa Rachmania, M.Si
8. Esa Ayu Pratama
9. Bulan
10. Liliani Isna Devi
11. Prof. Dr.Suminar Setiati Achmadi
12. Miss Tetty Kemala
13. Dr. Iman Rusmana, M.si