|
|
Line 23: |
Line 23: |
| <ul><p>DLD3 promoter + Holin +ADH terminator</p></ul> | | <ul><p>DLD3 promoter + Holin +ADH terminator</p></ul> |
| </div> | | </div> |
| + | <div class="context"> |
| <div class="context"> | | <div class="context"> |
| <h5>Identification of T7 RNAP Function in Nucleus</h5> | | <h5>Identification of T7 RNAP Function in Nucleus</h5> |
Line 59: |
Line 60: |
| <p> 5. Add 500μl LB medium without antibiotic, 37℃ shaking(225rpm/min), recover it for culturing it for 1 hour. </p> | | <p> 5. Add 500μl LB medium without antibiotic, 37℃ shaking(225rpm/min), recover it for culturing it for 1 hour. </p> |
| <p> 6. 3000rpm/min for 5mins, abandon the supermate, mixing the left. </p> | | <p> 6. 3000rpm/min for 5mins, abandon the supermate, mixing the left. </p> |
- | <p> 7. 60μl broth spread the Amp anti-LB soli<UL> | + | <p> 7. 60μl broth spread the Amp anti-LB solid plat, 37℃ inversed culture in incubation overnight. </p> </ul> |
- | <LI>March 12th, 2012 </li>
| + | |
- | <P>Events:</P>
| + | |
- | <P>March 12th. The first iGEM meeting was a very serious one, and there were only 5 members: Kang Chen Zhang Ou and Gong ,respectively.</P>
| + | |
- | <P>We decided to build a list about the whole previous iGEM projects and divided it into five parts: America for Kang and Chen, Europe for Zhang and Ou, Asia for Gong. All of us were in charge of scanning the projects, summarized them and gave the other members a brief description. Each one for one minute.</P>
| + | |
- | </UL>
| + | |
- | <UL>
| + | |
- | <LI>March 15th – April 13th, 2012</li>
| + | |
- | <P>Events:</P>
| + | |
- | <P>Though a recruitment talk with the other classmate in BGI, nearly 20 students and two instructors became members of us. We established a team consisted of eight schools—SCUT, SCNU, SCU, UESTC, WHU, HUST, SEU, UST.</P>
| + | |
- | <P>We continued to sum up the projects from 2008 to 2011, and in the meanwhile, we separated the whole into more parts and assigned to the other members.</P>
| + | |
- | <P>Finally, we finished the summary. </P>
| + | |
- | <P>And we also discussed what we should do, we originally put up with 4 schemes: Schrodinger’s cat—randomly producing 0 and 1; Density sensing application--based on the result of JIandong Wang’s research; Christmas tree—sparks different colors ceaselessly; Yeast artificial organelle—transform mitochondria into a biofactory. The former 3 projects were gave up due to the similarity to the previous iGEM projects. We lay down our consideration on Yeast artificial organelle.</P>
| + | |
- | <P>Chen Yu search more articles about mitochondria transgene and mitochondrial signaling pathways he can and pack it as a file of endnote.</P>
| + | |
- | <P>We clarify our projects as a combination of five modules: NAD+/NADH Sensor, self-killer, post-invader, sel-control transporter and artemisinin producer.</P>
| + | |
- | <P>We divided our group into five parts according to the modules and select two members of each modules to make up two new squads—modeling construction and lab experiments.</P>
| + | |
- | </UL>
| + | |
- | 2012/3/7
| + | |
- | MISSION START
| + | |
- | 1.
| + | |
- | TEAM BUILDING: OICQ GROUP;
| + | |
- | 2.
| + | |
- | ARRANGEMENTS FOR THE FIRST SEMINAR.
| + | |
- | 2012/3/8 noon
| + | |
- | THE FIRST SEMINAR:
| + | |
- | 1.
| + | |
- | Discussion about our project;
| + | |
- | 2.
| + | |
- | Registration for iGEM 2012 and self-introduce.
| + | |
- | 2012/3/14
| + | |
- | THE SECOND SEMINAR:
| + | |
- | 1.
| + | |
- | Discussion about our project;
| + | |
- | 2.
| + | |
- | Task assignment for latter seminar mainly about previous teams’ projects;
| + | |
- | 3.
| + | |
- | New member’s introduction.
| + | |
- | 2012/3/15
| + | |
- | Group email application succeeded.
| + | |
- | 2012/3/17
| + | |
- | Quan ZHOU withdrew from the team.
| + | |
- | 2012/3/18
| + | |
- | Jianhui GONG made a list of all projects of iGEM 2008-2011 and assigned each one’s seminar
| + | |
- | task.
| + | |
- | 2012/3/19
| + | |
- | THE THIRD SEMINAR:
| + | |
- | 1.
| + | |
- | Introduction of new members;
| + | |
- | 2.
| + | |
- | Rearrangements for everyone’s task.
| + | |
- | 2012/3/22
| + | |
- | THE FOURTH SEMINAR: Introduction of a few projects of iGEM 2008-2011.
| + | |
- | 2012/3/26
| + | |
- | THE FIFTH SEMINAR: Introduction of a few projects of iGEM 2008-2011.
| + | |
- | 2012/3/29
| + | |
- | THE SIXTH SEMINAR:
| + | |
- | 1.
| + | |
- | Introduction of a few projects of iGEM 2008-2011;
| + | |
- | 2.
| + | |
- | Introduction of new members;
| + | |
- | 3.
| + | |
- | Rearrangements for everyone’s task again.
| + | |
- | 2012/4/5
| + | |
- | THE SEVENTH SEMINAR: Introduction of a few projects of iGEM 2008-2011.
| + | |
- | 2012/4/7
| + | |
- | TEAM BUILDING ACTIVITY: KTV and dine outside together.
| + | |
- | 2012/4/10
| + | |
- | THE EIGTHTH SEMINAR: Each modules and logo designed.</ul></div>d plat, 37℃ inversed culture in incubation overnight. </p> </ul>
| + | |
| <ul><p>10. Colony PCR: </p> | | <ul><p>10. Colony PCR: </p> |
| <p> dNTPmix(2.5mM) 1μl</p> | | <p> dNTPmix(2.5mM) 1μl</p> |