Team:Osaka/week5

From 2012.igem.org

Revision as of 06:55, 28 August 2012 by Toty (Talk | contribs)

August 26 (Sun)

  1. Colony check
    • 1-1G,1-5A → Successfully transformed
    • 5-23O,1-7A → Transformed cells didn't grow on plates
  2. Transfer to liquid culture:1-1G,1-5A
  3. Preparation of LB agar plates (Tet)

August 27 (Mon)

  1. miniprep(1-1G,1-5A)
  2. Transformation(155,156)
    • Transformed cells did not grow on plates

August 28 (Tue)

  1. Preparation of LB agar plates (Amp,Cam)
  2. Ligation(155,156)
  3. Transformation(155,156,control)
  4. To liquid culture(152,155,Wild type)

August 29 (Wed)

August 30 (Thu)

August 31 (Fri)

September 1 (Sat)

Back to Notebook