Team:Fatih-Medical/Timeline new

From 2012.igem.org

Revision as of 22:37, 26 September 2012 by Maral (Talk | contribs)

  • Week 1

    Bla bla

  • Week 2

    '''Thursday''' * We made isolation for P2L1,P2L3,H1,C2,L2 and then digestion has been made with EcoR1 and Pst1 for all of these parts.After that electrophoresis was performed for these parts. * The results of P2L1 and P2L3 might be true , we are not sure about this so we need some expert assistance and we need to sequence these part for being sure. Unfortunately the result of L2 was wrong again. * We prepared a new liquid culture for L2.

  • Week 3

    '''Thursday''' * We made isolation for P2L1,P2L3,H1,C2,L2 and then digestion has been made with EcoR1 and Pst1 for all of these parts.After that electrophoresis was performed for these parts. * The results of P2L1 and P2L3 might be true , we are not sure about this so we need some expert assistance and we need to sequence these part for being sure. Unfortunately the result of L2 was wrong again. * We prepared a new liquid culture for L2.

Fatih Medical © 2012