Team:UC Chile/Cyano/Notepad
From 2012.igem.org
(→Week 7) |
|||
Line 74: | Line 74: | ||
[[File:proudresize.jpg]] | [[File:proudresize.jpg]] | ||
+ | |||
+ | Thursday 04.19 | ||
+ | |||
+ | Construct 1 is ready!!! | ||
+ | |||
+ | [[File:freddie.jpg]] | ||
+ | |||
+ | |||
+ | |||
To do: | To do: | ||
Assemble C2.1 and C2.2. Characterization of psAB and psbA2 promoters. | Assemble C2.1 and C2.2. Characterization of psAB and psbA2 promoters. |
Revision as of 17:19, 21 April 2012
In this page we shall write what is being done and what remains to be done.
Week 1
Week 2
Week 6
Week 7
Week 1
Week 2
Hey, it's just me at SJ library.
Monday: weekly meeting. We came up with three solutions for the sustentability problem. The formal proposal must be ready next Tuesday afternoon. Also, we designed primers for the integration biobrick experiment.
Tuesday: we prepared synechocystis culture media and lots of other pretty things :) I ate ice cream and pizza for example (seriously, need some help here!).
Wednesday: I am supposed to be studying proba instead of doing this. Can't concentrate though, too boring for me still.
Week 6
Sat 04.14
Horrible day. Nothing worked.
The one good thing:
Week 7
Tuesday 04.17
We purified parts for Construct 1 and then assembled them by Gibson. Hope everythings works out. Simon was wearing his Gibson Les Paul T-shirt so we kinda hope that the power of rock leads us through the good side of the force.
Also, have you ever seen a centrifuge dance? It's pretty funny actually.In one step of the purification, the protocol stated "centrifuge with lid open"
So we did...and it danced...
Pic of the day
Thursday 04.19
Construct 1 is ready!!!
To do: