Team:IvyTech-South Bend/Project

From 2012.igem.org

Revision as of 15:48, 3 October 2012 by Nan0t3k (Talk | contribs)


This is a template page. READ THESE INSTRUCTIONS.
You are provided with this team page template with which to start the iGEM season. You may choose to personalize it to fit your team but keep the same "look." Or you may choose to take your team wiki to a different level and design your own wiki. You can find some examples HERE.
You MUST have all of the pages listed in the menu below with the names specified. PLEASE keep all of your pages within your teams namespace.


Home Team Official Team Profile Project Parts Submitted to the Registry Modeling Notebook Safety Attributions



Contents

Overall project

<img src=The_Water_by_leepawlowicz.jpg Make sure your water is the best, use our arsenic test!!!

Project Details

Part 2

We compared the sensitivity of J33201 to the Gronigen Team’s K190015 pArs site using the Endy Lab’s expression vector J61002. We loaded J33201 into a kanamycin resistant backbone pSB1K3 and exchanged it with K190015 by perfoming an upstream cut of both to leave the RFP in the J61002 backbone. (Ratio of J33201 to K190015 plasmid DNA was 3:1) If the increased expression of ArsR had the effect of increasing the threshold of the arsenic response any resulting colonies of J33201 in J61002 we predicted would appear white.

Not wanting apparent success to get in our way we hypothesized that the addition of a second ArsR gene under pArs control should further raise the threshold of the device. We therefore added a terminiator to J33201 and coupled it upstream from J33201 and as a control K190015. A down stream cut of K190015 from J661002 expression plasmid yields pArs+RBS+RFP+Term.

The Experiment

June 18, 2012 Week 1. Staging and presentation of project storming to Ivy Tech advisory board. Parts research and descriptions.

June 25, 2012 Week 2. Continuation of parts research including promoters & killswitch screening and selction. Constitutive PTeT promoter, RBS, double terminator.

July 2, 2012 Week 3. Checked cultures and paired plates. Continuation of parts research and construction

Part 3

Results