Team:Osaka/week3

From 2012.igem.org

Revision as of 05:44, 18 August 2012 by Toty (Talk | contribs)

August 12 (Sun)

  1. Miniprep of yesterday's culture
  2. Restriction digests of minipreppped parts
  3. Gel electrophoresis of digests
  4. Ligation
    • 153(C):1-2M(upstream)+1-10H(downstream)+1-1A(vector)
    • 154(C):1-22A(upstream)+1-2M(downstream)+1-1A(vector)
    • 155(C):1-2D(upstream)+1-23L(downstream)+1-1A(vector)
  5. SDS-PAGE
    • Gel electrophoresis

August 16 (Thu)

  1. Transformaton of ligation products into DH5α E.coli:153~155
  2. Transformation of plasmid DNA into Rosetta E.coli:empty vector(A)

August 17 (Fri)

  1. Transfer to liquid culture

August 18 (Sat)

  1. Preparation of LB agar plates
  2. Miniprep of yesterday's culture
  3. PCR
  4. Restriction digests of minipreppped parts
  5. Gel electrophoresis of digests
  6. PCR purification
  7. Ligation

Back to Notebook