Team:Grenoble/Modeling/Notebook/September

From 2012.igem.org

Revision as of 16:23, 26 September 2012 by JulieH (Talk | contribs)

iGEM Grenoble 2012

Project

September

Week 36Week 37Week 38Week 39

Week 36: September 03rd to 09th


Goal
  • new study with the stochastic modeling : adaptation of the scripts
  • Continuation of the redaction for the stochastic part
  • A final check for the receptor parameters
  • Pooling the modeling parts

Conclusion
    Regarding the stochastic modeling, the first part of the script has been modified and we are working on its optimization. The redaction progresses slowly.
    Once the receptor’s parameters checked, we had to pool the signaling and the amplification models. We could thus estimate the sensitivity as well as the rapidity of our system.

Week 37: September 10th to 16th


Goal
  • End of the stochastic changes

Conclusion
    Unfortunately, because of a presentation to prepare, we didn't find time to end that stochastic modeling.

Week 38: September 17th to 23rd


Goal
  • End of the stochastic modeling and analyse of the results
  • End of the redaction for the stochastic part

Conclusion
    The stochastic modeling is definitely finished and the whole stochastic part in the wiki is written with analyses on the results.

Week 39: September 24th to 30th


Goal

Conclusion