Team:Cornell/project/drylab/status
From 2012.igem.org
(Difference between revisions)
JamesMathew (Talk | contribs) |
JamesMathew (Talk | contribs) |
||
Line 50: | Line 50: | ||
<br /><br /> | <br /><br /> | ||
Over the course of 5 months we have run through a full design cycle. | Over the course of 5 months we have run through a full design cycle. | ||
- | + | <br/> | |
- | + | ||
<table class="check-off" style="margin-top:20px;width:100%;"> | <table class="check-off" style="margin-top:20px;width:100%;"> | ||
<tr> | <tr> |
Revision as of 03:32, 27 October 2012
-
Dry Lab
- How It Works
- Functional Requirements
- Components
- Modeling
- Device Status
Device Status
From the beginnings of SAFEBET, Cornell iGEM set out to design and build a fully functional prototype. We have done just that.
Over the course of 5 months we have run through a full design cycle.
Over the course of 5 months we have run through a full design cycle.
Established strong set of functional requirements. | |
Developed design to fulfill functional requirements. | |
Fabricated device in house. | |
Tested and analyzed device for operation. |