Team:Amsterdam/modeling/generaldesign

From 2012.igem.org

(Difference between revisions)
Line 143: Line 143:
== In theory ==
== In theory ==
<center>
<center>
-
<embed src="https://static.igem.org/mediawiki/2012/f/f4/timeinferranceanim.swf" width="100%" height="100%">
+
<embed src="https://static.igem.org/mediawiki/2012/f/f4/Timeinferranceanim.swf" width="100%" height="100%">
<br>
<br>
<b>Figure 3</b>. Animation of <math>P_{1}(t)</math> over time with <math>s_{\text{off}}</math> at <math>t = 0</math>. From the measured value of <math>P_{t}</math>, <math>t</math> of measurement can be solved for as is shown using the dashed lines. The value of <math>P_{1}(t)</math> will decrease over time until it becomes 0. An interactive version of this plot has been included in the attached Mathematica file.
<b>Figure 3</b>. Animation of <math>P_{1}(t)</math> over time with <math>s_{\text{off}}</math> at <math>t = 0</math>. From the measured value of <math>P_{t}</math>, <math>t</math> of measurement can be solved for as is shown using the dashed lines. The value of <math>P_{1}(t)</math> will decrease over time until it becomes 0. An interactive version of this plot has been included in the attached Mathematica file.

Revision as of 21:44, 21 September 2012