Team:USP-UNESP-Brazil/Notebook

From 2012.igem.org

(Difference between revisions)
(QR1)
(First assemblies confirmed)
Line 272: Line 272:
===First assemblies confirmed===
===First assemblies confirmed===
-
After this messy period trying to fix the assembly's problems, the first good results came. We made with fully success QC1, QC4, QC5, QR4, QR5 and QR1 assemblies through 3A protocol. The results and Agarose Gel photos follows.  
+
After this messy period trying to fix the assembly's problems, the good results came. We made with fully success QC1, QC4, QC5, QR4, QR5 and QR1 assemblies through 3A protocol. The results and Agarose Gel photos follows.  

Revision as of 03:31, 27 September 2012