Team:Goettingen/week11-3
From 2012.igem.org
(Difference between revisions)
Line 53: | Line 53: | ||
<li>Observations and results: <br>The corresponding gel showed a band of the expected size.</li> | <li>Observations and results: <br>The corresponding gel showed a band of the expected size.</li> | ||
</ul><br> | </ul><br> | ||
- | <b>V07_11_2 1<sup>st</sup> round: Transforamtion of electrocompetent cells | + | <b>V07_11_2 1<sup>st</sup> round: Transforamtion of electrocompetent cells with the mutant plasmid mixture</b><br> |
<ul> | <ul> | ||
<li>Experiment: <br>Electrocompetent cells were prepared according to <a href="https://2012.igem.org/Team:Goettingen/Project/Methods">protocol</a>. We transformed 200 µL of cells with 10 µL of DNA according to the protocol of <a href="https://2012.igem.org/Team:Goettingen/week10-3">week 10</a>. Dilution plates and liquid culture was incubated over night at 37 °C, 180 rpm.</li> | <li>Experiment: <br>Electrocompetent cells were prepared according to <a href="https://2012.igem.org/Team:Goettingen/Project/Methods">protocol</a>. We transformed 200 µL of cells with 10 µL of DNA according to the protocol of <a href="https://2012.igem.org/Team:Goettingen/week10-3">week 10</a>. Dilution plates and liquid culture was incubated over night at 37 °C, 180 rpm.</li> |
Revision as of 16:35, 24 September 2012
Deutsch / English |
#3 Chemoreceptor Library - 11th WeekBack to overview
Back to overview |