Team:Groningen/Notebook/Wetwork 6June2012
From 2012.igem.org
(Difference between revisions)
(Created page with "We're making competent E.coli cells untill Friday for growing our Bio-Bricks. MolGen will provide us with two boxes for the -80 freezer. Buffers (TAE) and media (TY) are made.") |
|||
(14 intermediate revisions not shown) | |||
Line 1: | Line 1: | ||
- | We're making competent E.coli cells | + | {{HeaderGroningen2012}} |
+ | |||
+ | <html> | ||
+ | <head> | ||
+ | <style type="text/css"> | ||
+ | p.margin | ||
+ | { | ||
+ | font-size:12pt; | ||
+ | line-height:12pt; | ||
+ | color:white; | ||
+ | |||
+ | margin-top:0px; | ||
+ | margin-bottom:20px; | ||
+ | margin-left:150px; | ||
+ | margin-right:250px; | ||
+ | } | ||
+ | |||
+ | |||
+ | </style> | ||
+ | </head> | ||
+ | |||
+ | <body> | ||
+ | <br><br><br> | ||
+ | <p class="margin">Buffers (RF1, RF2, EDTA, TAE 25x, TE, Tris) and TY broth were made and put them in the autoclave (check always Emeraldo's lab journal). | ||
+ | We're making competent E.coli cells this week for growing our Bio-Bricks, therefore E.coli Dh5a was plated out on fresh medium today. | ||
+ | <br><br> | ||
+ | MolGen will provided us space in the -80 freezer C at rack 17 F and G on the 6th floor. A PC is delivered and ready to use for making reservations of MolGen equipment. | ||
+ | <br><br> | ||
+ | And we performed a literature study to look for a potential 2 component system. | ||
+ | <br> | ||
+ | <A HREF="https://2012.igem.org/Team:Groningen/Notebook"><FONT COLOR=#ff6700>Back to notebook</FONT></A> | ||
+ | </p> | ||
+ | <br><br> | ||
+ | </body> | ||
+ | </html> | ||
+ | |||
+ | {{Template:SponsorsGroningen2012}} |
Latest revision as of 16:36, 25 September 2012
Buffers (RF1, RF2, EDTA, TAE 25x, TE, Tris) and TY broth were made and put them in the autoclave (check always Emeraldo's lab journal).
We're making competent E.coli cells this week for growing our Bio-Bricks, therefore E.coli Dh5a was plated out on fresh medium today.
MolGen will provided us space in the -80 freezer C at rack 17 F and G on the 6th floor. A PC is delivered and ready to use for making reservations of MolGen equipment.
And we performed a literature study to look for a potential 2 component system.
Back to notebook