Team:Cornell/project/drylab/status
From 2012.igem.org
(Difference between revisions)
JamesMathew (Talk | contribs) |
|||
(2 intermediate revisions not shown) | |||
Line 36: | Line 36: | ||
<a href="https://2012.igem.org/Team:Cornell/project/drylab/status">Device Status</a> | <a href="https://2012.igem.org/Team:Cornell/project/drylab/status">Device Status</a> | ||
</li> | </li> | ||
- | + | ||
</ul> | </ul> | ||
</div> | </div> | ||
Line 46: | Line 46: | ||
</div> | </div> | ||
<div class="row last-ele"> | <div class="row last-ele"> | ||
- | <div class=" | + | <div class="six columns"> |
+ | <br/> | ||
From the beginnings of SAFEBET, Cornell iGEM set out to design and build a fully functional prototype. We have done just that. | From the beginnings of SAFEBET, Cornell iGEM set out to design and build a fully functional prototype. We have done just that. | ||
- | <br /><br /> | + | <br /> |
+ | <br /> | ||
Over the course of 5 months we have run through a full design cycle. | Over the course of 5 months we have run through a full design cycle. | ||
- | + | ||
+ | </div> | ||
+ | <div class="six columns"> | ||
<table class="check-off" style="margin-top:20px;width:100%;"> | <table class="check-off" style="margin-top:20px;width:100%;"> | ||
<tr> | <tr> | ||
- | <td> | + | <td> Established strong set of functional requirements. </td> |
- | + | <td style="width:40px"><img src="https://static.igem.org/mediawiki/2012/5/5a/Checkmark.png"></td> | |
- | + | ||
- | <td style="width:40px"> | + | |
- | + | ||
- | + | ||
</tr> | </tr> | ||
<tr> | <tr> | ||
- | <td> | + | <td> Developed design to fulfill functional requirements. </td> |
- | + | <td><img src="https://static.igem.org/mediawiki/2012/5/5a/Checkmark.png"></td> | |
- | + | ||
- | <td> | + | |
- | + | ||
- | + | ||
</tr> | </tr> | ||
<tr> | <tr> | ||
- | <td> | + | <td> Fabricated device in house. </td> |
- | + | <td><img src="https://static.igem.org/mediawiki/2012/5/5a/Checkmark.png"></td> | |
- | + | ||
- | <td> | + | |
- | + | ||
- | + | ||
</tr> | </tr> | ||
<tr> | <tr> | ||
- | <td> | + | <td> Tested and analyzed device for operation. </td> |
- | + | <td><img src="https://static.igem.org/mediawiki/2012/5/5a/Checkmark.png"></td> | |
- | + | ||
- | <td> | + | |
- | + | ||
- | + | ||
</tr> | </tr> | ||
</table> | </table> |
Latest revision as of 20:25, 12 November 2012
-
Dry Lab
- How It Works
- Functional Requirements
- Components
- Modeling
- Device Status
Device Status
From the beginnings of SAFEBET, Cornell iGEM set out to design and build a fully functional prototype. We have done just that.
Over the course of 5 months we have run through a full design cycle.
Established strong set of functional requirements. | |
Developed design to fulfill functional requirements. | |
Fabricated device in house. | |
Tested and analyzed device for operation. |