Team:Exeter/lab book/3gip/wk6

From 2012.igem.org

(Difference between revisions)
 
(One intermediate revision not shown)
Line 118: Line 118:
     <p><b><u>Monday 13th August</u></b></p>
     <p><b><u>Monday 13th August</u></b></p>
-
<p>See <a href="https://2012.igem.org/Team:Exeter/lab_book/gibs/wk6" style="color:#57B947"><u>Operon Construction 13th - 17th August</u></a> of RBS-<i>wbbC</i>(d) (BBa_B0034 + BBa_K764005)</p>
+
<p>See <a href="https://2012.igem.org/Team:Exeter/lab_book/gibs/wk6" style="color:#57B947" target="_blank"><u>Operon Construction 13th - 17th August</u></a> of RBS-<i>wbbC</i>(d) (BBa_B0034 + BBa_K764005)</p>
<p></p><br>
<p></p><br>
<p><b><u>Tuesday 14th August</u></b></p>
<p><b><u>Tuesday 14th August</u></b></p>
-
<p>See <a href="https://2012.igem.org/Team:Exeter/lab_book/gibs/wk6" style="color:#57B947"><u>Operon Construction 13th - 17th August</u></a> of RBS-<i>wbbC</i>(d) (BBa_B0034 + BBa_K764005)</p>
+
<p>See <a href="https://2012.igem.org/Team:Exeter/lab_book/gibs/wk6" style="color:#57B947" target="_blank"><u>Operon Construction 13th - 17th August</u></a> of RBS-<i>wbbC</i>(d) (BBa_B0034 + BBa_K764005)</p>
<p></p><br>
<p></p><br>
Line 148: Line 148:
   
   
  </table>
  </table>
 +
 +
<table width="980" align="center" cellspacing="20">
 +
<tr align="center">
 +
  <td>
 +
  <font color="#57B947" size="1" face="Verdana">
 +
    <p><u>Website Designed and Built by: Ryan Edginton, James Lynch & Alex Clowsley</u> &nbsp;&nbsp;|&nbsp;&nbsp;
 +
    <a href="https://igem.org/Team.cgi?id=764" style="color:#57B947" target="_blank"><u>Contact Us</u></a>  &nbsp;&nbsp;|&nbsp;&nbsp;
 +
    <a href="https://2012.igem.org/Team:Exeter/site_map" style="color:#57B947"><u>Site Map</u></a></p>
 +
  </font>
 +
  </td>
 +
</tr>
 +
</table>
</body>
</body>
</html>
</html>

Latest revision as of 00:06, 27 September 2012

ExiGEM2012 Lab Book 3GP wk6

The 3-Gene Inducible Plasmid: 13th - 17th August 2012

Monday 13th August

See Operon Construction 13th - 17th August of RBS-wbbC(d) (BBa_B0034 + BBa_K764005)


Tuesday 14th August

See Operon Construction 13th - 17th August of RBS-wbbC(d) (BBa_B0034 + BBa_K764005)


Wednesday 15th August

Morning

Miniprepping

BBa_J13002 + wbnK BBa_B0014 in pSB1T3

wfcA + BBa_B0014 in pSB1T3

wbnJ + BBa_B0014 in pSB1T3

BBa_B0034 wbbC + BBa_B0014 in pSB1T3

Using the changed protocol. The tubes were centrifuged for 10 minutes to start to ensure a good pellet formed.

After the neutralisation solution had been added, the eppendorfs were centrifuged for 10 minutes rather than 5 in order to get a better pellet formation.

40ul of water was added instead of 50ul in order to make sure the concentration of DNA increased.

All were nanodropped and only wfcA + BBa_B0014 and wbnJ + BBa_B0014 gave good concentrations.


Wednesday 15th August – Friday 17th August

Preparation for presentation so no lab work.

Website Designed and Built by: Ryan Edginton, James Lynch & Alex Clowsley   |   Contact Us   |   Site Map