Team:Cornell/project/drylab/status
From 2012.igem.org
(Difference between revisions)
DanVLevine (Talk | contribs) |
|||
Line 49: | Line 49: | ||
<div class="row last-ele"> | <div class="row last-ele"> | ||
<div class="seven columns"> | <div class="seven columns"> | ||
- | + | From the beginnings of SAFEBET, Cornell iGEM set out to design and build a fully functional prototype. We have done just that. | |
<br /><br /> | <br /><br /> | ||
- | + | Over the course of 5 months we have run through a full design cycle. | |
</div> | </div> | ||
<div class="five columns"> | <div class="five columns"> | ||
Line 57: | Line 57: | ||
<tr> | <tr> | ||
<td> | <td> | ||
- | + | Established strong set of functional requirements. | |
</td> | </td> | ||
<td style="width:40px"> | <td style="width:40px"> | ||
Line 65: | Line 65: | ||
<tr> | <tr> | ||
<td> | <td> | ||
- | + | Developed Design to fulfill specifications from functional requirements. | |
</td> | </td> | ||
<td> | <td> | ||
Line 73: | Line 73: | ||
<tr> | <tr> | ||
<td> | <td> | ||
- | + | Fully fabricated device in house. | |
</td> | </td> | ||
<td> | <td> | ||
Line 81: | Line 81: | ||
<tr> | <tr> | ||
<td> | <td> | ||
- | + | Tested and analyzed device for operation. | |
</td> | </td> | ||
<td> | <td> |
Revision as of 03:25, 27 October 2012
-
Dry Lab
- How It Works
- Functional Requirements
- Components
- Modeling
- Device Status
- 3D Model
Device Status
From the beginnings of SAFEBET, Cornell iGEM set out to design and build a fully functional prototype. We have done just that.
Over the course of 5 months we have run through a full design cycle.
Over the course of 5 months we have run through a full design cycle.
Established strong set of functional requirements. | |
Developed Design to fulfill specifications from functional requirements. | |
Fully fabricated device in house. | |
Tested and analyzed device for operation. |