Team:Paris-Saclay/Project/Notebook/Week 7

From 2012.igem.org

(Difference between revisions)
(Week 7)
 
(One intermediate revision not shown)
Line 50: Line 50:
<div id="content-paris-saclay">
<div id="content-paris-saclay">
='''Week 7'''=
='''Week 7'''=
-
{{Team:Paris-Saclay/Follow}}
+
 
[[Category:Team:Paris-Saclay/Project Gemote/Notebook|g]]
[[Category:Team:Paris-Saclay/Project Gemote/Notebook|g]]
__NOTOC__
__NOTOC__
-
*PCR in large volume to have a lot a available biobricks
+
*PCR in large volume to increase the amount of available biobricks.
-
*Treatment with DPN1 to eliminate plasmids  
+
*Treatment with DPN1 to eliminate plasmids.
-
*Gel purification to only keep our interest fragments  
+
*Gel purification to only keep fragments of interest.
-
*Gibson Assembly method to put together the different biobricks for each construction
+
*Gibson Assembly method to put together the different biobricks for each construction.
-
*Transformation with assembly products and staggering on a selective medium
+
*Transformation with assembly products and staggering on a selective medium.
-
*Colony PCR to have results before the transformation results
+
*Colony PCR to have results before the transformation results.

Latest revision as of 00:30, 27 September 2012

Follow us !

Week 7

  • PCR in large volume to increase the amount of available biobricks.
  • Treatment with DPN1 to eliminate plasmids.
  • Gel purification to only keep fragments of interest.
  • Gibson Assembly method to put together the different biobricks for each construction.
  • Transformation with assembly products and staggering on a selective medium.
  • Colony PCR to have results before the transformation results.