Team:Paris-Saclay/Project/Notebook/Week 6
From 2012.igem.org
(Difference between revisions)
YohannPetiot (Talk | contribs) |
(→Week 6) |
||
(4 intermediate revisions not shown) | |||
Line 24: | Line 24: | ||
<body> | <body> | ||
<div id="tiles"> | <div id="tiles"> | ||
- | + | <div id="single-tile3" class="red live-tile" data-mode="flip" data-delay="4000"> | |
<div> | <div> | ||
<a href="https://2012.igem.org/Team:Paris-Saclay/Project/Abstract"> | <a href="https://2012.igem.org/Team:Paris-Saclay/Project/Abstract"> | ||
<div class="child-tile"><p class="child-tile">GEMOTE Project</p></div> | <div class="child-tile"><p class="child-tile">GEMOTE Project</p></div> | ||
- | <img src=" | + | <img src="https://static.igem.org/mediawiki/2012/7/7c/Project-1.png" alt="" /> |
</a> | </a> | ||
</div> | </div> | ||
<div> | <div> | ||
<a href="https://2012.igem.org/Team:Paris-Saclay/Project/Abstract"> | <a href="https://2012.igem.org/Team:Paris-Saclay/Project/Abstract"> | ||
- | <img src=" | + | <img src="https://static.igem.org/mediawiki/2012/d/d1/Project2.jpg" alt="" /> |
<div class="child-tile"><p class="child-tile">GEMOTE Project</p></div> | <div class="child-tile"><p class="child-tile">GEMOTE Project</p></div> | ||
</a> | </a> | ||
Line 49: | Line 49: | ||
</div> | </div> | ||
<div id="content-paris-saclay"> | <div id="content-paris-saclay"> | ||
- | + | ='''Week 6'''= | |
+ | |||
[[Category:Team:Paris-Saclay/Project Gemote/Notebook|f]] | [[Category:Team:Paris-Saclay/Project Gemote/Notebook|f]] | ||
__NOTOC__ | __NOTOC__ | ||
- | + | *Other PCR to amplify the different fragments we need to assemble the biobricks. | |
- | *Other PCR to amplify the different fragments we need to assemble the biobricks | + | *Electrophoresis gel to verify the length of each biobrick. |
- | *Electrophoresis gel to verify the length of each | + | *Purification of the PCR products if the length was the right one. |
- | *Purification of the PCR products if the length was the | + | *Plasmid (we have to make our construction in a plasmid so that we can easily keep the DNA) resuspension using iGEM protocol. |
- | *Plasmid (we have to make our construction in a plasmid | + | |
- | + | ||
{{Team:Paris-Saclay/Follow}} | {{Team:Paris-Saclay/Follow}} |
Latest revision as of 00:30, 27 September 2012
Week 6
- Other PCR to amplify the different fragments we need to assemble the biobricks.
- Electrophoresis gel to verify the length of each biobrick.
- Purification of the PCR products if the length was the right one.
- Plasmid (we have to make our construction in a plasmid so that we can easily keep the DNA) resuspension using iGEM protocol.
Follow us !