Team:USP-UNESP-Brazil/Notebook

From 2012.igem.org

(Difference between revisions)
(From 12/06/2012 to 12/08/2012 – Assemblies attempts)
(First assemblies confirmed)
Line 272: Line 272:
After this messy period trying to fix the assembly's problems, the first good results came. We made with fully success QC1, QC4, QC5, QR4, QR5 and QR1 assemblies through 3A protocol. The results and Agarose Gel photos follows.  
After this messy period trying to fix the assembly's problems, the first good results came. We made with fully success QC1, QC4, QC5, QR4, QR5 and QR1 assemblies through 3A protocol. The results and Agarose Gel photos follows.  
 +
 +
 +
====QC1====
 +
 +
====QC4====
 +
 +
====QC5====
 +
 +
====QR4====
 +
 +
====QR5====
 +
 +
====QR1====
 +
At this moment we’re having issues on the assembly of small parts. Other methods of assembling, such as the Standard, are being tested in order to overpass it.
At this moment we’re having issues on the assembly of small parts. Other methods of assembling, such as the Standard, are being tested in order to overpass it.

Revision as of 20:51, 26 September 2012