Team:Grenoble/Modeling/Notebook/September
From 2012.igem.org
(Difference between revisions)
Greghansen (Talk | contribs) |
|||
Line 22: | Line 22: | ||
<li>new study with the stochastic modeling : adaptation of the scripts</li> | <li>new study with the stochastic modeling : adaptation of the scripts</li> | ||
<li>Continuation of the redaction for the stochastic part</li> | <li>Continuation of the redaction for the stochastic part</li> | ||
+ | <li>A final check for the receptor parameters</li> | ||
+ | <li>Pooling the modeling parts</li> | ||
</ul> | </ul> | ||
</br> | </br> | ||
Line 27: | Line 29: | ||
</br> | </br> | ||
<ul> | <ul> | ||
- | Regarding the stochastic modeling, the first part of the script has been modified and we are working on its optimization. The redaction progresses slowly.</ul> | + | Regarding the stochastic modeling, the first part of the script has been modified and we are working on its optimization. The redaction progresses slowly. |
+ | </br> | ||
+ | Once the receptor’s parameters checked, we had to pool the signaling and the amplification models. We could thus estimate the sensitivity as well as the rapidity of our system. </ul> | ||
</section> | </section> | ||
Revision as of 16:23, 26 September 2012
September
Week 36 • Week 37 • Week 38 • Week 39Week 36: September 03rd to 09th
Goal- new study with the stochastic modeling : adaptation of the scripts
- Continuation of the redaction for the stochastic part
- A final check for the receptor parameters
- Pooling the modeling parts
-
Regarding the stochastic modeling, the first part of the script has been modified and we are working on its optimization. The redaction progresses slowly.
Once the receptor’s parameters checked, we had to pool the signaling and the amplification models. We could thus estimate the sensitivity as well as the rapidity of our system.
Week 37: September 10th to 16th
Goal- End of the stochastic changes
-
Unfortunately, because of a presentation to prepare, we didn't find time to end that stochastic modeling.
Week 38: September 17th to 23rd
Goal- End of the stochastic modeling and analyse of the results
- End of the redaction for the stochastic part
-
The stochastic modeling is definitely finished and the whole stochastic part in the wiki is written with analyses on the results.