Team:Exeter/lab book/3gip/wk6
From 2012.igem.org
m |
|||
Line 91: | Line 91: | ||
</p> | </p> | ||
<a href="https://2012.igem.org/Team:Exeter/lab_book/3gip/wk11"; style="color:#1d1d1b">17th - 21st September</a> | <a href="https://2012.igem.org/Team:Exeter/lab_book/3gip/wk11"; style="color:#1d1d1b">17th - 21st September</a> | ||
+ | <p> | ||
+ | - | ||
+ | </p> | ||
+ | <a href="https://2012.igem.org/Team:Exeter/Results/inducible"; style="color:#e30614"><font size="3"><b>Results</b></font></a> | ||
+ | </font> | ||
</font> | </font> | ||
</div> | </div> | ||
<!--End Project Division Week Hyperlinks--> | <!--End Project Division Week Hyperlinks--> | ||
- | |||
</td> | </td> | ||
Revision as of 11:42, 26 September 2012
The 3-Gene Inducible Plasmid: 13th - 17th August 2012 Monday 13th August See Operon Construction 13th - 17th August of RBS-wbbC(d) (BBa_B0034 + BBa_K764005) Tuesday 14th August See Operon Construction 13th - 17th August of RBS-wbbC(d) (BBa_B0034 + BBa_K764005) Wednesday 15th August Morning BBa_J13002 + wbnK BBa_B0014 in pSB1T3 wfcA + BBa_B0014 in pSB1T3 wbnJ + BBa_B0014 in pSB1T3 BBa_B0034 wbbC + BBa_B0014 in pSB1T3 Using the changed protocol. The tubes were centrifuged for 10 minutes to start to ensure a good pellet formed. After the neutralisation solution had been added, the eppendorfs were centrifuged for 10 minutes rather than 5 in order to get a better pellet formation. 40ul of water was added instead of 50ul in order to make sure the concentration of DNA increased. All were nanodropped and only wfcA + BBa_B0014 and wbnJ + BBa_B0014 gave good concentrations. Wednesday 15th August – Friday 17th August Preparation for presentation so no lab work. |