Team:Exeter/lab book/3gip/wk6

From 2012.igem.org

(Difference between revisions)
m
m
Line 116: Line 116:
<p>See Operon Construction: 13th - 17th August 2012</p>
<p>See Operon Construction: 13th - 17th August 2012</p>
-
<p>https://2012.igem.org/Team:Exeter/lab_book/gibs/wk6</p>
+
<p>https://2012.igem.org/Team:Exeter/lab_book/gibs/wk6</p><br>
<p><b><u>Tuesday 14th August</u></b></p>
<p><b><u>Tuesday 14th August</u></b></p>

Revision as of 19:55, 25 September 2012

ExiGEM2012 Lab Book 3GP wk6

The 3-Gene Inducible Plasmid: 13th - 17th August 2012

Monday 13th August

See Operon Construction: 13th - 17th August 2012

https://2012.igem.org/Team:Exeter/lab_book/gibs/wk6


Tuesday 14th August

See Operon Construction: 13th - 17th August 2012

https://2012.igem.org/Team:Exeter/lab_book/gibs/wk6


Wednesday 15th August

Morning

Mini-Prepping

BBa_J13002 + wbnK BBa_B0014 in pSB1T3

wfcA + BBa_B0014 in pSB1T3

wbnJ + BBa_B0014 in pSB1T3

BBa_B0034 wbbC + BBa_B0014 in pSB1T3

Using the changed protocol. The tubes were centrifuged for 10 minutes to start to ensure a good pellet formed.

After the neutralisation solution had been added, the eppindorfs were centrifuged for 10 minutes rather than 5 in order to get a better pellet formation.

40ul of water was added instead of 40ul in order to make sure the concentration of DNA increased.

All were nanodropped and only wfcA + BBa_B0014 and wbnJ + BBa_B0014 gave good concentrations.


Wednesday 15th August –Friday 17th August

Preparation of presentation so no lab work.