Team:HKUST-Hong Kong/Achievement

From 2012.igem.org

(Difference between revisions)
Line 322: Line 322:
               <h1></h1>
               <h1></h1>
           </div>
           </div>
-
           <p>Our iGEM journey has spanned the length of six months, from the day it was first proposed in mid-March to the day we ended wet lab work in mid-September. <br />
+
           <p>Our iGEM journey has spanned the length of six months; from the day our project was first proposed in mid-March to the day we ended wet lab work in mid-September. <br />
   We are proud to say that within our three months of wet lab work we have achieved the following:</p>
   We are proud to say that within our three months of wet lab work we have achieved the following:</p>
<ol>
<ol>

Revision as of 14:56, 25 September 2012

Team:HKUST-Hong Kong - 2012.igem.org

ACHIEVEMENT

Our iGEM journey has spanned the length of six months; from the day our project was first proposed in mid-March to the day we ended wet lab work in mid-September.
We are proud to say that within our three months of wet lab work we have achieved the following:

  1. Successfully constructed the parts for displaying recognition peptide, RPMrel, on the cell wall of Bacillus subtilis (BBa_K733007).
  2. Successfully constructed two parts for BMP-2 synthesis and excretion using signaling peptides YbdN and YdjM respectively (BBa_K733016, BBa_K733017).
  3. Successfully constructed a cell growth inhibition device for regulating BMP-2 production (BBa_K733012).
  4. Successfully characterized the low efficiency promoter pTms which was used to drive the expression of antitoxin YdcD (BBa_K733009, BBa_K733018).
  5. Successfully characterized a xylose-inducible promoter which was used to control the expression of BMP-2 and toxin YdcE.
  6. Successfully characterized the cell growth inhibition device.