Team:Goettingen/week11-3

From 2012.igem.org

(Difference between revisions)
Line 33: Line 33:
<ul>
<ul>
<li>Observations and results: <br>The corresponding gel showed a band of the expected size.</li>
<li>Observations and results: <br>The corresponding gel showed a band of the expected size.</li>
-
</ul>
+
</ul><br>
<b>V07_10_2 1<sup>st</sup> round: Ligation</b><br>
<b>V07_10_2 1<sup>st</sup> round: Ligation</b><br>
<ul>
<ul>

Revision as of 14:16, 22 September 2012

Deutsch  / English 

#3 Chemoreceptor Library - 11th Week

Back to overview

V07_10


V07_10_1 1st round: Digestion DpnI/BsaI and clean-up
  • Experiment:
    The digestion and subsequent clean-up were carried out according to the protocol week 10.
  • Observations and results:
    The corresponding gel showed a band of the expected size.

V07_10_2 1st round: Ligation
  • Experiment:
    The digestion and subsequent clean-up were carried out according to the protocol week 10.
  • Observations and results:
    The corresponding gel showed a band of the expected size.


Back to overview

↑ Back to top!