Team:SUSTC-Shenzhen-B/week 2/8

From 2012.igem.org

(Difference between revisions)
Line 11: Line 11:
         <div id="templatemo_main">
         <div id="templatemo_main">
             <div class="col col23">
             <div class="col col23">
 +
<font face="Arial, Helvetica">
                 <h2>August</h2>
                 <h2>August</h2>
                 <h3>Abstract</h3>
                 <h3>Abstract</h3>
Line 35: Line 36:
                     <li><a href="https://2012.igem.org/Team:SUSTC-Shenzhen-B/week 5/8">week 5</a></li>
                     <li><a href="https://2012.igem.org/Team:SUSTC-Shenzhen-B/week 5/8">week 5</a></li>
                 </ul>
                 </ul>
-
      
+
     </font>
                 <div class="cleaner h40"></div>
                 <div class="cleaner h40"></div>
   
   

Revision as of 00:17, 27 September 2012

SUSTC iGEM Theme - Free CSS Template

SUSTC iGEM Theme - Free CSS Template

August

Abstract

2. We can do nothing but wait the sequences.

Week 2

8.05.2012-8.11.2012

8.05.2012

I didn’t assign any task to our team members, we could do anything we want.


8.06.2012-8.11.2012

It was the longest week I’ve ever felt. We waited our primer day after day but it didn’t come until August 12th. The package was delayed by the typhoon went through Shanghai(where the company we made the purchase from located)and a mistake the carrier made about the address.

During this week, we made a change to the sequence and handed another list to the company. We also read some articles on how to build a model.