Team:SUSTC-Shenzhen-B/week 2/8

From 2012.igem.org

(Difference between revisions)
(Created page with "{{tempalte:sustc_shenzhen_b/1}} <html> <head> <meta http-equiv="Content-Type" content="text/html; charset=utf-8" /> <title>SUSTC iGEM Theme - Free CSS Template</title> <meta name...")
Line 32: Line 32:
                     <li><a href="https://2012.igem.org/Team:SUSTC-Shenzhen-B/week 2/8">week 2</a></li>
                     <li><a href="https://2012.igem.org/Team:SUSTC-Shenzhen-B/week 2/8">week 2</a></li>
                     <li><a href="https://2012.igem.org/Team:SUSTC-Shenzhen-B/week 3/8">week 3</a></li>
                     <li><a href="https://2012.igem.org/Team:SUSTC-Shenzhen-B/week 3/8">week 3</a></li>
 +
                    <li><a href="https://2012.igem.org/Team:SUSTC-Shenzhen-B/week 4/8">week 4</a></li>
 +
                    <li><a href="https://2012.igem.org/Team:SUSTC-Shenzhen-B/week 5/8">week 5</a></li>
                 </ul>
                 </ul>
      
      

Revision as of 07:23, 11 September 2012

SUSTC iGEM Theme - Free CSS Template

SUSTC iGEM Theme - Free CSS Template

August

Abstract

我继续卖萌:)

Week 2

8.05.2012-8.11.2012

8.05.2012

I didn’t assign any task to our team members, we could do anything we want.


8.06.2012-8.11.2012

It was the longest week I’ve ever felt. We waited our primer day after day but it didn’t come until August 12th. The package was delayed by the typhoon went through Shanghai(where the company we made the purchase from located)and a mistake the carrier made about the address.

During this week, we made a change to the sequence and handed another list to the company. We also read some articles on how to build a model.