Team:Grenoble/Modeling/Notebook/July/29

From 2012.igem.org

Revision as of 14:24, 4 September 2012 by JulieH (Talk | contribs)

iGEM Grenoble 2012

Project

July

Week 27Week 28Week 29Week 30

Week 29: July 16th to 22th


Goal
  • Research of parameters for ODE's
  • Integration of arabinose in our model

Completion
    All the parameters have not been found but Arabinose has been integrated in the system. We have to work with a few arabinose else the system will always be turned on. The integration of arabinose enabled us to have a better control on cya.