Team:Cornell/project/drylab/status

From 2012.igem.org

(Difference between revisions)
Line 51: Line 51:
Over the course of 5 months we have run through a full design cycle.
Over the course of 5 months we have run through a full design cycle.
</div>
</div>
-
<div class="five columns">
+
<div class="seven columns">
<table class="check-off" style="margin-top:20px;width:100%;">
<table class="check-off" style="margin-top:20px;width:100%;">
<tr>
<tr>

Revision as of 03:31, 27 October 2012

Device Status

From the beginnings of SAFEBET, Cornell iGEM set out to design and build a fully functional prototype. We have done just that.

Over the course of 5 months we have run through a full design cycle.
Established strong set of functional requirements.
Developed design to fulfill functional requirements.
Fabricated device in house.
Tested and analyzed device for operation.