Team:Cambridge/Lab book/Week 5

From 2012.igem.org

Revision as of 16:31, 26 July 2012 by Ap650 (Talk | contribs)

Week: 3 4 5 6 7

Contents

Monday

Tuesday

Wednesday

Thursday

Our device, reaching perfection!

Our device is close to being implemented. The filtered photoresistors are placed now in the right position, the motory circuit is also functioning, the main chassis of the device is constructed and painted. The mirrors used to surround the cuvettes are still missing though and so is the mechanical coupler designed by us and being constructed at the Instrument shop of the Engineering Department. The device is powered by a 9V battery.

Friday