Team:Cambridge/Lab book/Week 5

From 2012.igem.org

(Difference between revisions)
(Thursday)
(Thursday)
Line 17: Line 17:
===Thursday===
===Thursday===
-
[[File:deviceprototype.jpg|thumb|700px|Our device, reaching perfection!]]
+
[[File:deviceprototype.jpg|thumb|500px|Our device, reaching perfection!]]
 +
 
 +
 
Our device is close to being implemented. The filtered photoresistors are placed now in the right position, the motory circuit is also functioning, the main chassis of the device is constructed and painted. The mirrors used to surround the cuvettes are still missing though and so is the mechanical coupler designed by us and being constructed at the Instrument shop of the Engineering Department. The device is powered by a 9V battery.
Our device is close to being implemented. The filtered photoresistors are placed now in the right position, the motory circuit is also functioning, the main chassis of the device is constructed and painted. The mirrors used to surround the cuvettes are still missing though and so is the mechanical coupler designed by us and being constructed at the Instrument shop of the Engineering Department. The device is powered by a 9V battery.

Revision as of 16:31, 26 July 2012

Week: 3 4 5 6 7

Contents

Monday

Tuesday

Wednesday

Thursday

Our device, reaching perfection!


Our device is close to being implemented. The filtered photoresistors are placed now in the right position, the motory circuit is also functioning, the main chassis of the device is constructed and painted. The mirrors used to surround the cuvettes are still missing though and so is the mechanical coupler designed by us and being constructed at the Instrument shop of the Engineering Department. The device is powered by a 9V battery.

Friday